Shannon Airport Authority DAC wishes to procure the services of a multi-discipline contractor for the purpose of design, installation, integration, validation and certification of the delivery of a compliant Standard 3 Hold Baggage Screening System upgrade at Shannon Airport. The project comprises the design, supply, installation, testing, integration, validation, commissioning and certification of a Standard 3 Hold Baggage System (HBS) Upgrade at Shannon Airport from concept development through to detail design, build and handover including associated statutory certifications required to deliver a compliant system.
Deadline
The time limit for receipt of tenders was 2018-10-29.
The procurement was published on 2018-09-28.
Suppliers
The following suppliers are mentioned in award decisions or other procurement documents:
Contract notice (2018-09-28) Object Scope of the procurement
Title: Baggage-scanning equipment
Short description:
Shannon Airport Authority DAC wishes to procure the services of a multi-discipline contractor for the purpose of design, installation, integration, validation and certification of the delivery of a compliant Standard 3 Hold Baggage Screening System upgrade at Shannon Airport.
The project comprises the design, supply, installation, testing, integration, validation, commissioning and certification of a Standard 3 Hold Baggage System (HBS) Upgrade at Shannon Airport from concept development through to detail design, build and handover including associated statutory certifications required to deliver a compliant system.
Shannon Airport Authority DAC wishes to procure the services of a multi-discipline contractor for the purpose of design, installation, integration, validation and certification of the delivery of a compliant Standard 3 Hold Baggage Screening System upgrade at Shannon Airport.
The project comprises the design, supply, installation, testing, integration, validation, commissioning and certification of a Standard 3 Hold Baggage System (HBS) Upgrade at Shannon Airport from concept development through to detail design, build and handover including associated statutory certifications required to deliver a compliant system.
Notice metadata
Original language: English ๐ฃ๏ธ
Document type: Contract notice
Nature of contract: Works
Regulation: European Union
Common procurement vocabulary (CPV)
Code: Baggage-scanning equipment๐ฆ
Additional CPV: Airport equipment๐ฆ Place of performance
NUTS region: รire/Ireland๐๏ธ
Procedure
Procedure type: Competitive procedure with negotiation
Type of bid: Submission for all lots
Award criteria
The most economic tender
Object Scope of the procurement
Short description:
Shannon Airport Authority DAC wishes to procure the services of a multi-discipline contractor for the purpose of design, installation, integration, validation and certification of the delivery of a compliant Standard 3 Hold Baggage Screening System upgrade at Shannon Airport.
Shannon Airport Authority DAC wishes to procure the services of a multi-discipline contractor for the purpose of design, installation, integration, validation and certification of the delivery of a compliant Standard 3 Hold Baggage Screening System upgrade at Shannon Airport.
The project comprises the design, supply, installation, testing, integration, validation, commissioning and certification of a Standard 3 Hold Baggage System (HBS) Upgrade at Shannon Airport from concept development through to detail design, build and handover including associated statutory certifications required to deliver a compliant system.
The project comprises the design, supply, installation, testing, integration, validation, commissioning and certification of a Standard 3 Hold Baggage System (HBS) Upgrade at Shannon Airport from concept development through to detail design, build and handover including associated statutory certifications required to deliver a compliant system.
Estimated total value: 9 000 000 EUR ๐ฐ
Short description:
Shannon Airport Authority DAC wishes to procure the services of a multi-discipline contractor for the purpose of design, installation, integration, validation and certification of the delivery of a compliant Standard 3 Hold Baggage screening system upgrade at Shannon Airport.
Shannon Airport Authority DAC wishes to procure the services of a multi-discipline contractor for the purpose of design, installation, integration, validation and certification of the delivery of a compliant Standard 3 Hold Baggage screening system upgrade at Shannon Airport.
The project comprises any displacement relocation or construction works required to deliver a compliant system and should allow for the removal of the existing Standard 2 screening equipment at the airport, which comprises a sum of 2 standard lines and one out of gauge machine.
The project comprises any displacement relocation or construction works required to deliver a compliant system and should allow for the removal of the existing Standard 2 screening equipment at the airport, which comprises a sum of 2 standard lines and one out of gauge machine.
+ 2 more
The upgraded Standard 3 Hold Baggage Screening System should be fully operational in advance of the 1.9.2020 deadline.
A full performance specification will be provided at Stage 2 -RFT.
Estimated value excluding VAT: 9 000 000 EUR ๐ฐ
Duration: 18 months Place of performance
Main site or place of performance: Shannon
Procedure
Legal basis: 32014L0024
Time of receipt of tenders: 15:00
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Complementary information Review body
Name: Shannon Airport Authority DAC
Postal town: Shannon
Country: Ireland ๐ฎ๐ช
Source: OJS 2018/S 190-428788 (2018-09-28)
Contract award notice (2019-09-20) Object Scope of the procurement
Short description:
Shannon Airport Authority DAC wishes to procure the services of a multi-discipline contractor for the purpose of design, installation, integration, validation and certification of the delivery of a compliant standard 3 hold baggage screening system upgrade at Shannon Airport.
The project comprises the design, supply, installation, testing, integration, validation, commissioning and certification of a standard 3 Hold Baggage System (HBS) Upgrade at Shannon Airport from concept development through to detail design, build and handover including associated statutory certifications required to deliver a compliant system.
Shannon Airport Authority DAC wishes to procure the services of a multi-discipline contractor for the purpose of design, installation, integration, validation and certification of the delivery of a compliant standard 3 hold baggage screening system upgrade at Shannon Airport.
The project comprises the design, supply, installation, testing, integration, validation, commissioning and certification of a standard 3 Hold Baggage System (HBS) Upgrade at Shannon Airport from concept development through to detail design, build and handover including associated statutory certifications required to deliver a compliant system.
Total value of the procurement: 9734214.81 EUR ๐ฐ
Notice metadata
Document type: Contract award notice
Object Scope of the procurement
Short description:
Shannon Airport Authority DAC wishes to procure the services of a multi-discipline contractor for the purpose of design, installation, integration, validation and certification of the delivery of a compliant standard 3 hold baggage screening system upgrade at Shannon Airport.
Shannon Airport Authority DAC wishes to procure the services of a multi-discipline contractor for the purpose of design, installation, integration, validation and certification of the delivery of a compliant standard 3 hold baggage screening system upgrade at Shannon Airport.
The project comprises the design, supply, installation, testing, integration, validation, commissioning and certification of a standard 3โฆ
โฆ Hold Baggage System (HBS) Upgrade at Shannon Airport from concept development through to detail design, build and handover including associated statutory certifications required to deliver a compliant system.
โฆ hold baggage system (HBS) Upgrade at Shannon Airport from concept development through to detail design, build and handover including associated statutory certifications required to deliver a compliant system.
The project comprises any displacement relocation or construction works required to deliver a compliant system and should allow for the removal of the existing standard 2 screening equipment at the airport, which comprises a sum of 2 standard lines and one out of gauge machine.
The project comprises any displacement relocation or construction works required to deliver a compliant system and should allow for the removal of the existing standard 2 screening equipment at the airport, which comprises a sum of 2 standard lines and one out of gauge machine.
The upgraded standard 3 hold baggage screening system should be fully operational in advance of the 1.9.2020 deadline.
Place of performance
Main site or place of performance: Shannon.
Award of contract
Date of contract conclusion: 2019-07-10 ๐
Name: Flynn Contractors
Postal town: Dublin
Country: Ireland ๐ฎ๐ช Information about tenders
Number of tenders received: 2