Technical and Economic Consultancy Support for Networs โ (PR4 Implementation and ECP)
CER regulates the level of revenue which the electricity Transmission System Operators (TSO), electricity Distribution System Operators (DSO), electricity Transmission Asset Owner (TAO) and electricity Distribution Asset Owner (DAO) (collectively the โnetwork companiesโ can recover from customers to cover their respective costs.
Existing policy for connection of exporting generators to the electricity network in Ireland is captured under two broad processing approaches: the Group Processing Approach (GPA) and the Non-Group Processing Approach (non-GPA).
The successful tenderer will be required to provide the CER with expert economic and technical advice in relation to these decisions at various stages of the CER's consultation and decision making process.
A detailed specification of requirements is set out in Appendix 1 of the Request For Tender (RFT) available to download from
www.etenders.gov.ie
Deadline
The time limit for receipt of tenders was 2017-03-20.
The procurement was published on 2017-02-10.
Suppliers
The following suppliers are mentioned in award decisions or other procurement documents:
Who?
What?
Where?
Procurement history
Date |
Document |
2017-02-10
|
Contract notice
|
2017-08-11
|
Contract award notice
|