New Acute Mental Health Unit at Sligo University Hospital
The works consist of the construction of a new part single storey and part 2 story acute mental health unit along with stores and ancillary hospital accommodation. The gross floor area of the new building is approximately 3 500 sqm. Works include demolition of existing single storey modular building, significant reduction of site levels, new retaining walls, link to hospital, new internal road arrangement, car parking and other associated site works. The proposed construction is concrete frame structure with steel roof structure. External walls are generally Masonry cavity walls with sections of rain screen cladding. Roofs are a mixture of flat and pitched roofs. The applicant should note that the main hospital will remain operational throughout the works. As a result, works for occupied areas will need to be done at night and outside of normal working hours.
Deadline
The time limit for receipt of tenders was 2016-11-07.
The procurement was published on 2016-09-30.
Who?
What?
Procurement history
Date |
Document |
2016-09-30
|
Contract notice
|