New Build and Alteration Works to Sacred Heart Hospital Community Nursing Unit Castlebar
The development will comprise the demolition of two wards and part of the link corridor at the east of the site, (4 698 ha) and the construction of a two storey extension (3 720 sq m total gross floor space), a single storey link corridor (47 sq m gross floor space), raising the parapet of the existing link corridor at the east of the site by approximately 1 metre, and the provision of an electrical backup generator 8.5 sq m, medical gas enclosure 12 sq m and vacuum plant enclosure 15 sq m in the service area at the north west of the site. The extension will include 70 single bedrooms, 2 two- bed rooms and associated support and ancillary accommodation and it will replace the existing 8-bed rooms in the wards to be demolished.
The development will also consist of the following works: provision of two lifts, mechanical and electrical installations modifications to the existing perimeter road to the east of the site; reduction in car parking spaces located between the two wards at the south east of the site from 31 to 18 spaces; alterations to existing site services (water supply and foul and surface water drainage) and provision of Sustainable Urban Drainage systems; associated hard and soft landscaping; and all other associated site excavation and site development works above and below ground.
Modifications to the internal layouts to the existing kitchen and laundry are also being considered and may form part of the Works.
Deadline
The time limit for receipt of tenders was 2015-05-20.
The procurement was published on 2015-04-17.
Who?
What?
Procurement history
Date |
Document |
2015-04-17
|
Contract notice
|