GWM 2722 Ash and FGD Haulage
The operational process in Moneypoint Generating Station requires the transport of material from each of the following processes on Moneypoint site — Ash haulage from the ash hoppers to the ash disposal area and Flue-Gas Desulphurisation (FGD) by-product haulage from FGD by-product hopper in Coalyard to adjacent landfill area This tender enquiry provides for the hire of suitable trucks, vibrating roller and excavator to transport and manage the above. The hire of trucks and other plant may be required either with or without a driver. This tender also includes the services of a Tractor and Bowser for the purpose of dust suppression and sweeping of the haulage route with a station supplied road sweeper and the Loading of Furnace Bottom Ash from the main station jetty on to ships for export abroad To participate, please respond in full to Section III.2 of this Contract Notice.
ESB's preference is to award a single contract for this work however it reserves the right to divide the work into lots.
Deadline
The time limit for receipt of tenders was 2015-09-09.
The procurement was published on 2015-08-06.
Who?
What?
Procurement history
Date |
Document |
2015-08-06
|
Contract notice
|