Proposed First Floor Fit-Out of Existing Acute Psychiatric Unit and New Link Bridge to Existing Hospital at Beaumont Hospital, Dublin 9

Beaumont Hospital

The proposed works are located on the Beaumont Hospital Campus. The works comprise the First Floor Fit-Out of the Existing Acute Psychiatric Unit to include a Haemodialysis Unit (Approx. 2,400 m) and a separate Mental Health Unit for both Psychiatry of Old Age and Mental Health and Intellectual Disabilities (Approx. 1,200 m). The New covered Link Bridge to the Existing Hospital (Approx. 170 m) is accessed from two new Stair and Lift Cores (Approx. 270 m). The Ground Floor of the 44 bed Acute Psychiatric residential Unit will remain occupied and fully operational for the duration of the project and careful co-ordination will be required with the operators to ensure critical 24 hour services are maintained.

Deadline
The time limit for receipt of tenders was 2015-01-12. The procurement was published on 2014-11-10.

Who?

What?

Where?

Procurement history
Date Document
2014-11-10 Contract notice