HOB Refurbishment Project (Design and Build)

Dublin Airport Authority plc (DAA)

The Contracting Authority will produce a set of documents prior to issuing the Request for Proposal for the D&B contract; the documents will include Design Intent information accompanied with performance specifications. The documents will be referred to as the โ€˜Employers Requirements Documentsโ€™. The D&B Contractor shall complete the design in accordance with the Employers Requirement Documents with the object of constructing and handing over a refurbished office building fully commissioned and fit for purpose.

Deadline
The time limit for receipt of tenders was 2014-09-19. The procurement was published on 2014-08-19.

Who?

What?

Where?

Procurement history
Date Document
2014-08-19 Contract notice