Framework (July 2014) - Kildare County Council's Framework Agreement for Traffic Control Equipment Supply and Installation 2014-2016

Kildare County Council

Kildare County Council proposes to establish and operate a Framework Agreement for Traffic Control Equipment Supply & Installation. The proposed works includes but is not limited to:
— Supply & installation of traffic control equipment including traffic signal equipment, pedestrian crossing traffic signal equipment (Pelican, Toucan, Pegasus and Zebra), electronic bollards, belisha beacons, controllers, in-station equipment, cycle counting, red light detection cameras, traffic counting and classifying equipment, Speed Limit Cameras, out-station monitoring units, out- station transmission units, push buttons, school warning signage, variable messaging signage etc.
— All equipment, both hardware and software, must be consistent with the MOVA/UTC SCOOT equipment currently being used;
— Installation of XYZ, MOVA, SCOOT, speed, counting loops and above ground detectors, including approved kerbside detection and on-crossing detection;
— Detailed design of traffic signal layouts in AutoCAD, relevant configuration, implemented and validation of UTC/SCOOT and MOVA by specialist staff;
— General works associated with supply and installation of traffic signal equipment for UTC/SCOOT and MOVA controlled junctions including traffic management;
— Supply and Installation or removal of traffic control equipment;
— Installation of GSM and wireless communications for RMS and UTC/SCOOT and MOVA equipment consistent with Kildare County Council's current network;
— Install controller specifications onto Kildare County Council's Fault Management System (FMS) Hardware, Remote Monitoring System (RMS) hardware and Urban Traffic Control (UTC) System Hardware.
— Design, Configuration and Commission of Traffic Control equipment onto County Kildare's FMS, RMS and UTC; and
— Accepting the role and responsibilities of carrying out the duties of Project Supervisor of Design Process, Designer and Project Supervisor for the Construction Stage.

Deadline
The time limit for receipt of tenders was 2014-09-30. The procurement was published on 2014-07-11.

Who?

What?

Procurement history
Date Document
2014-07-11 Contract notice