Contract for the Engineering Design, Supply, Installation and Commissioning of Environmental Abatement Equipment

SmartPly Europe Ltd

The general scope required is all inclusive for the engineering, design, equipment supply, installation, commissioning and documentation for all environmental abatement equipment.
Key features of the scope of supply are as follows:
1) Collection and transport of exhaust gases from Continuous Press (120,000 mยณ/hr approx.), Press Hall (90,000 mยณ/hr approx.) and Board Cooler (60,000 mยณ/hr approx.) to existing Wet Electrostatic Precipitators.
2) Pre-cleaning of the exhaust gas from the Continuous Press (120,000 mยณ/hr approx.).
3) ATEX Certified equipment where necessary.
4) Fire and explosion protection.
5) External equipment suitable for coastal region.
6) Declaration of Conformity for installed assembly in line with EU Machinery Directive 2006/42/EC.
This notice is a voluntary publication from an Industrial Subsidiary of Public Authority therefore the EU Directive time-lines do not apply. Smartply will not be responsible for any costs in connection with the procurement procedure, irrespective of the outcome, whether or not the procedure is cancelled or postponed.

Deadline
The time limit for receipt of tenders was 2014-08-15. The procurement was published on 2014-07-30.

Who?

What?

Where?

Procurement history
Date Document
2014-07-30 Contract notice