Supplier: ABB LTD

4 archived procurements

Recent procurements where the supplier ABB LTD is mentioned

2019-01-17   1) Integrated (Power Components and User Interface Required to be as a Single Unit) EV Charge Station Supporting 50... (Electricity Supply Board (ESB))
1) Integrated (power components and user interface required to be as a single unit) EV charge station supporting 50 kW outlets via CHAdeMO/CCS and 43kW AC outlets; 2) Integrated (power components and user interface required to be as a single unit) EV charge station supporting 25 kW outlets via CHAdeMO/CCS outlet. View the procurement ยป
Mentioned suppliers: ABB LTD Delta Electronics (Netherlands) BV Efacec Electric Mobility, S.A. Tokheim Ireland Ltd
2018-05-03   EV Ultra-Fast Charge Point Units (Electricity Supply Board (ESB))
The contracting entity intends to procure multi (3) member Frameworks for the supply and commissioning of EV Chargers of up to circa 350kW capacity including associated equipment and services to be delivered in Ireland. These frameworks will not include installation of equipment. Lot 1 โ€“ Ultra fast charge points including greater than 100Kw and up to 350Kw dedicated output to CCS and Chademo. Lot 2 โ€“ Ultra fast charge points up to 160Kw simultaneous output to CCS and Chademo. Lot 3 โ€“ Ultra fast charge โ€ฆ View the procurement ยป
Mentioned suppliers: ABB LTD Efacec Electric Mobility, S.A.
2017-05-22   Request for Tenders to Establish single supplier contract(s) for the provision of Electrical Engineering Equipment... (Dublin Institute of Technology)
The School of Electrical and Electronic Engineering requires new and up to date equipment to facilitate the delivery of the new electrical apprenticeship curriculum, version 4.1. Delivery, installation and commissioning of all new equipment will be in DIT Kevin Street Dublin 8. View the procurement ยป
Mentioned suppliers: ABB LTD ABB Ltd. Feedback Instrument Ltd
2015-01-28   To Support Settlement, Credit Management, Registration, and System Operations (EirGrid plc)
The objective of this Pre-Qualification Questionnaire (PQQ) process is to produce a short-list of suitably qualified companies who will be invited to tender for software solutions and/or service provider offerings to help EirGrid meet the scope of their responsibilities for the Integrated Single Electricity Market (I-SEM). View the procurement ยป
Mentioned suppliers: ABB LTD