2021-07-09Independent Safety Assessor for S.E and T Enabling Works (Iarnrod Eireann-Irish Rail)
Iarnród Éireann has chosen to replace the existing CTC Centre at Connolly Station, Dublin 1 with a new NTCC Centre at Heuston Station, Dublin 8. It is intended that the development of the new National Train Control Centre will address any historical deficiency, by replacing the CTC with a modern, modular, fully integrated Traffic Management System (TMS), with the eventual capability to re-control all existing signalling on the IE network and to be scalable to allow for future re-signalling projects to be …
View the procurement »
2019-12-09Independent Assessor for IÉ’s National Train Control Centre — Traffic Management System Project (Iarnrod Eireann-Irish Rail)
Iarnród Éireann (IE) has a requirement to engage an Independent Assessor (IA) for the National Train Control Centre Project (NTCC). The selected Independent Assessor (IA) will be asked to produce an independent assessment plan against this remit. The IA is to fulfil the roles of an Assessment Body (CSM-AB) under the common safety method on risk assessment and evaluation [CSM 352/2009]. The IA may be required to fulfil the role of an Independent Assessor (IA) under the CENELEC standard [EN50129].
View the procurement » Mentioned suppliers:Rina Services S.p.A
2019-02-18Independent Safety Assessor (Iarnrod Eireann — Irish Rail)
Iarnród Éireann (IE) has a requirement to engage an Independent Safety Assessor (ISA) for the TPS Trackside Project (IEHS). The selected Independent Safety Assessor will be asked to produce an ISA Plan against this remit. The ISA is required to fulfil the roles of an Assessment Body under the Common Safety Method on Risk Assessment and Evaluation [CSM 352/2009] and an independent assessor (IA) under the Railway Safety Act 2005 [RSA].
The ISA is required to independently assess designs and documentation …
View the procurement »