2019-09-06Samuel Beckett Civic Campus Phase 2: Timber Facade (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a sports and community building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following:
A. the change of use of the Phase 1 sports and community building to a library and community building;
B. refurbishment of the existing sports building to create a new library;
C. the construction of a new sports building, incorporating a 25 metre swimming pool, a โฆ
View the procurement ยป
2019-09-06Samuel Beckett Civic Campus: Main Contract (Dun Laoghaire Rathdown County Council)
The site is located on Ballyogan Road, Carrickmines and is adjacent to the LUAS line. Phase 1 included a Sports and Community Building, sports pitches and surface car parks. Phase 2 will expand on Phase 1 and will include the following:
(a) the change of use of the Phase 1 sports and community building to a library and community building;
(b) refurbishment of the existing sports building to create a new library;
(c) the construction of a new sports building, incorporating a 25 metre swimming pool, a โฆ
View the procurement ยป
2015-08-27Works Specialists with Design Input for the new childrenโs hospital at St James Campus, Dublin 8 (National Paediatric Hospital Development Board)
The scope of the main works for the new children's hospital in broad terms comprises of:
โ The demolition of all buildings on the site of the new children's hospital;
โ Construction of a new children's hospital building and associated helipad;
โ A two-level underground car park under same, with a further level of shared facilities management hub and energy centre below;
โ Public realm improvements to the existing St James's campus spine road; the linear park at the Rialto Luas stop and the public steps โฆ
View the procurement ยป