2023-05-30Marina Park Phase 2 (Cork City Council)
The proposed Marina Park Phase 2 is situated between Cork City South Docklands and Blackrock Village. The scheme aims to provide an โeco-parkโ and an area of high-quality public realm and landscape, while protecting and enhancing the natural heritage and biodiversity of the area. The scheme aims to improve public accessibility and amenities through the site. It includes the restoration and protection of historical structures and the creation of points or interest and park attractions such as โNatureโ โฆ
View the procurement ยป
2022-03-31Supply of Rigid PVC-u Sheet Piling (Bord Na Mona)
Bord na Mรณna has, in recent years, permanently ceased peat production. In line with Bord na Mรณnaโs accelerated decarbonization strategy, the company has also committed to an ambitious scheme for enhanced peatland rehabilitation.
The Peatland Climate Action Scheme (PCAS) focuses on optimizing suitable hydrological conditions (stable water levels close to the surface) by blocking production field drains and employing other wetland engineering measures. These measures will create soggy peatland conditions โฆ
View the procurement ยป
2021-03-12The Supply and Delivery of Steel Sheet Piles to the Morell River Flood Management Scheme, Turnings Lower, North... (Office of Public Works (OPW))
Tenders are invited for the supply and delivery of steel sheet piles for the construction of flood relief works being carried out on the Morell River and its tributaries in locations between Kill and Turnings Lower in Co. Kildare. The works involve the construction of approximately 7.5 km of earthen embankments along the banks of the Morell, Kill, Slane and the Painstown rivers. The sheet piles are required to be installed under a number of the embankments to reduce the rate of seepage under the earthen โฆ
View the procurement ยป Mentioned suppliers:Mertex UK Ltd
2019-09-27Carrigaline Western Relief Road (Cork County Council)
Construction of a single 750 m carriageway road. The CWRR will run along the southern boundary of Nova Court residential estate, before crossing over the Owenboy River, by means of a 32 m reinfroced concrete river bridge. Current land-use within the CPO lands primarily comprises Greenfield lands; however residential properties and brownfield sites are located in the northern portion of the proposed CWRR route. Pedestrian and traffic lights will be placed at the north, south and central junctions to โฆ
View the procurement ยป Mentioned suppliers:BAM Civil Ltd
2014-02-14D20/CON/322 Piling & Shoring Equipment Hire (ESB Networks)
ESB Networks requires one or more suitable supplier(s) to provide a cost effective hiring service for piling, trencing, shoring, tenchless, pipe stoppers, bracing struts, box systems, propping, excavation support, trench boxes, dragboxes, edge protection, walers, and multibrace solution equipment to support its capital and operational delivery programmes. This equipment covers all major and all necessary accessories required to support the hiring of trenching and shoring.