2023-07-26   IWAK RWY26 RESA Upgrade (Connaught Airport Development Company Ltd)
The objective for this project is to upgrade the RWY 26 RESA and the associated an ancillary works to ensure that the RWY 26 RESA is fully the exiting RESA against clauses from Chapter C โ€“ Runway End Safety Area of the European Union Aviation Safety Agency (EASA) Certification Specifications and Guidance Material for Aerodrome Design (CS-ADR-DSN) Issue 6. View the procurement ยป
2022-04-19   Framework for the design, supply, manufacture, installation, commissioning, maintenance and enhancement of a new... (daa plc)
Currently Dublin Airport is operating at Level 2 A-SMGCS (Advanced Surface Movement Guidance System) as defined by Euro control. The airport has developed a master plan to realise higher levels of A-SMGCS (Level 4 -Conflict Resolution, Automatic Planning & Guidance) and โ€œFollow the Greenโ€ type operations over a number of years if required by the business. To implement these higher levels of A-SMGCS will require the introduction of individual lamp control and monitoring technology which is not currently โ€ฆ View the procurement ยป
2021-12-06   Design, manufacture, supply, installation, commissioning, maintenance and enhancement of a new Airfield Lighting... (daa plc)
The existing Airfield Lighting Control and Monitoring System (ALCMS) consists of Touch Screen PCโ€™s and Siemens S7 PLC units. Touch screens providing interfaces to the control system are located in the Visual Control Room (VCR) of the Air Traffic Control (ATC) Tower and in the Fire Station Visual Cab (used as a Contingency Tower for ATC); the VCR touch screens are connected to separate PCs within the respective sub cabs. The heart of the system is a Siemens S7 PLC, which communicates with the airfield โ€ฆ View the procurement ยป
2019-10-01   Airfield Lighting Individual Lamp Control and Monitoring System (ILCMS) (daa plc)
Request for Information for design, manufacture, supply, installation, commissioning, maintenance and enhancement of a new Airfield individual lamp control and monitoring system (ILCMS) at Dublin Airport. View the procurement ยป
2016-03-15   Pre-Qualification Questionnaire (PQQ) for Construction Works relating to Runway 06/24 Rehabilitation and Associated... (Shannon Airport Authority plc)
Shannon Airport Authority (SAA) wishes to appoint a suitably qualified and experienced Contractor to deliver the Runway 06/24 Rehabilitation and Associated Works project at Shannon Airport. View the procurement ยป
Mentioned suppliers: Lagan Asphalt Ltd
2014-12-11   LED Lighting Supplier Framework Contract (Dublin Airport Authority plc ( DAA ))
P2593 โ€” LED Lighting Supplier Framework Contract. View the procurement ยป
2014-01-13   P1494 - Supply of AGL fittings and Signs (Dublin Airport Authority plc ( DAA ))
The Contracting Authority wishes to appoint a Supplier(s) to manufacture and supply Airfield Lighting Fittings, and Airfield Signs, and any other associated equipment to Cork and Dublin Airports for a 5 year period with an option to extend for a further 2 years. View the procurement ยป
2012-12-17   Irish Aviation Regulator - Creation of panel to advise the Irish Aviation Regulator on price caps and other economic issues (Commission for Aviation Regulation)
The Commission for Aviation Regulation (CAR) regulates airport charges at Dublin Airport and aviation terminal charges at Dublin, Shannon and Cork Airports. It invites expressions of interest from consultants that would like to be on a general panel from which tenders will be invited to assist the CAR in its role as an economic regulator. This panel will last until 31 December 2015. During this period - a new determination on airport charges at Dublin airport is due no later than 31 December 2014. - The โ€ฆ View the procurement ยป
2012-03-21   New runway end safety areas at Kerry Airport (Kerry Airport PLC)
The main works subject to this contract contain the following: โ€” Threshold 26 relocation, โ€” CAT I approach lighting system relocation, โ€” Eastern RESA extension to approximately 150mx240m, โ€” Western RESA extension to approximately 150mx240m, โ€” Construction of concrete box to channel open drain, โ€” Construction of Eastern runway turn pad extension, โ€” Construction of Western runway turn pad extension, โ€” Installation of runway guard lights, โ€” Relocation of PAPI, โ€” Relocation of glide path, โ€” Reparation of โ€ฆ View the procurement ยป