2016-11-21   Limerick Gasworks Remediation _Phase 2 (Soil Stabilisation/ Solidification) (Ervia)
Design of soil binder mixes and implementing Soil Stabilisation and Solidification works to contaminated soils 3 m deep over a 1.4 ha site based on this design. View the procurement ยป
2012-08-13   Limerick Former Gasworks, Pump and Treat Remediation (Bord Gais Eireann)
The contract comprises the remediation of the former Limerick Gasworks. Further to a comprehensive site investigation and quantitative risk assessment it has been identified that free product (coal tar) comprising DNAPL (Dense Non Aqueous Phase Liquid) needs to be removed from site. The remediation solution will comprise the extraction of free product by a pumping methodology with subsequent removal of DNAPL for disposal/recycling using sustainable techniques where appropriate and practically and โ€ฆ View the procurement ยป