The project consists of the construction of a new circa 15,500m2 Business School. The building will include adaptable teaching spaces, lecture theatres, creative and innovation spaces, student and staff learning commons/breakout spaces, offices and a restaurant/cafรฉ space. It also includes the refurbishment of the existing buildings 18 and 19 on South Terrace. Building structure is steel frame with metal deck and structural concrete floor. The external elevation will consist of high-quality glazing and brick faรงade. The roof is a single membrane on a RC structure with roof paving and green roofs in areas. Internally the building has lightweight internal walls and is subdivided into separate spaces to house the separate accommodations. The building and systems will be designed to achieve BREEAM Excellent certification. The siteworks includes for site preparation, bike parking, new services which connect into existing services.
Deadline
The time limit for receipt of tenders was 2023-08-04.
The procurement was published on 2023-06-23.
Object Scope of the procurement
Title: UCC Prequalification of Works Contractors for Cork University Business School
Products/services: Construction work๐ฆ
Short description:
โThe project consists of the construction of a new circa 15,500m2 Business School. The building will include adaptable teaching spaces, lecture theatres,...โ
Short description
The project consists of the construction of a new circa 15,500m2 Business School. The building will include adaptable teaching spaces, lecture theatres, creative and innovation spaces, student and staff learning commons/breakout spaces, offices and a restaurant/cafรฉ space. It also includes the refurbishment of the existing buildings 18 and 19 on South Terrace. Building structure is steel frame with metal deck and structural concrete floor. The external elevation will consist of high-quality glazing and brick faรงade. The roof is a single membrane on a RC structure with roof paving and green roofs in areas. Internally the building has lightweight internal walls and is subdivided into separate spaces to house the separate accommodations. The building and systems will be designed to achieve BREEAM Excellent certification. The siteworks includes for site preparation, bike parking, new services which connect into existing services.
The project consists of the construction of a new circa 15,500m2 Business School. The building will include adaptable teaching spaces, lecture theatres, creative and innovation spaces, student and staff learning commons/breakout spaces, offices and a restaurant/cafรฉ space. It also includes the refurbishment of the existing buildings 18 and 19 on South Terrace. Building structure is steel frame with metal deck and structural concrete floor. The external elevation will consist of high-quality glazing and brick faรงade. The roof is a single membrane on a RC structure with roof paving and green roofs in areas. Internally the building has lightweight internal walls and is subdivided into separate spaces to house the separate accommodations. The building and systems will be designed to achieve BREEAM Excellent certification. The siteworks includes for site preparation, bike parking, new services which connect into existing services.
Show more Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
Duration of the contract, framework agreement or dynamic purchasing system
The time frame below is expressed in number of months.
Description
Duration: 24
Procedure Type of procedure
Restricted procedure
Administrative information
Time limit for receipt of tenders or requests to participate: 2023-08-04
12:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Complementary information Review body
Name: High Court
Postal town: Dublin
Country: Ireland ๐ฎ๐ช
URL: https://www.courts.ie๐
Source: OJS 2023/S 122-386821 (2023-06-23)