Thermal power plant construction work
Endesa Ireland Limited
Combined Cycle Gas Turbine (CCGT) -Great Island Project -BOP & CCGT Integration. Endesa Ireland wishes to invite expressions of interest for Balance of Plant (BOP) and Combined Cycle Gas Turbine (CCGT) Integration and Installation Works, Supplies & Services for the Great Island CCGT Generating Station project. It is anticipated that the scope of works will include the complete turnkey design and execution of a CCGT power generating station in Great Island, Co Wexford, installing and integrating certain equipment (Power Train, Step-up Transformer and Grid Connection) to be supplied separately to the project. The Balance of Plant (BOP) required for the execution of a CCGT is to be supplied under the scope of this contract. The successful Candidate may be required to enter bilateral contracts with the equipment supplier(s). (The equipment supplier(s) will supply the Power Train, Step-up Transformer and Grid Connection Cabling and therefore the supply of this equipment is outside the scope of this contract.). The scope shall include the detailed design and engineering, manufacturing, transport, construction, assembly, testing and commissioning, as well as all civil works necessary to build the combined cycle station. Further detail will be set out in later tender documentation. The development has received planning permission under the strategic infrastructure act. The planning application, EIS and conceptual design drawings are available at http://www.greatislandpowerproject.com/. Additional information is supplied with this notice at http://www.etenders.gov.ie. To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=164352.
DeadlineThe time limit for receipt of tenders was 2010-12-13. The procurement was published on 2010-11-27.
Who? What?| Date | Document |
|---|---|
| 2010-11-25 | Contract notice |
Object
Scope of the procurement
Title: Thermal power plant construction work
Full text:
โCombined Cycle Gas Turbine (CCGT) -Great Island Project -BOP & CCGT Integration. Endesa Ireland wishes to invite expressions of interest for Balance of...โ
Place of performance
ie024 ๐๏ธ
Notice metadata
Document type: Contract notice
Nature of contract: Works
Regulation: European Communities, with participation by GPA countries
Original language: English ๐ฃ๏ธ
Procedure
Procedure type: Negotiated procedure
Award criteria
The most economic tender
Type of bid: Not defined
Awarding authority type: Utilities
Main activity: Electricity
Contracting authority
Identity
Awarding authority name: Endesa Ireland Limited
Country: Ireland ๐ฎ๐ช
Contact
Internet address: http://www.endesa.es/Portal/en/our_business/electricity/europe/Ireland/ ๐
Reference
Dates
Publication date: 2010-11-27 ๐
Date dispatched: 2010-11-25 ๐
Submission deadline: 2010-12-13 ๐
Identifiers
Notice number (legacy): 353964-2010
OJ-S issue: 231/2010
Object
Common procurement vocabulary (CPV)
Code: Thermal power plant construction work ๐ฆ
Source: OJS 2010/S 231-353964 (2010-11-25)
- Construction work (>20 new procurements)