Description of the procurement
The swimming pool is located in the Defence Forces Physical Education School, Defence Forces Training Centre, Curragh Camp, Co. Kildare. It is proposed to refurbish the changing / main entrance section of the building. The proposed upgrade will require alteration work to include the taking down of a partition wall and the insertion of changing cubicles in changing areas. Existing floor surface replacement, existing wall surface replacement, floors and ceilings and redecoration. Mechanical and electrical upgrade.