Sewerage work
Galway County Council
Title attributed to the contract by the contracting authority: Clifden Sewerage Scheme Upgrade Stage 1: Clifden Waste Water Treatment Plant. Clifden sewerage scheme upgrade Stage 1 - Clifden waste water treatment plant is a design, build, operate and maintain (DBO) contract. This contract is for the design, construction, commissioning and operation of the Clifden wastewater treatment plant. The operation period of the DBO contract is 20 years. The contract will include the transport of thickened or dewatered sludge from the WWTP to a sludge satellite centre. The existing Clifden WWTP provides primary treatment and discharges settled sewage into the estuary of the Owenglin River in the inner Clifden Bay. Clifden has a current population of approximately 2,200 and is serviced by a combined stormwater/sewage drainage network. As the existing sewerage infrastructure has insufficient capacity to cater for the current and projected populations and the current level of treatment is inadequate, Galway County Council have proposed a two stage upgrade to the Clifden sewerage scheme. This contract is for the Stage 1 WWTP, which will be designed for a population equivalent of 4,975 P.E. In order to comply with the current Urban Waste Water Treatment Regulations effluent quality parameters of 25 mg/l BOD5 and 35 mg/l SS or better are required. Based on the shellfish water quality requirements in Clifden Bay and hydrographic modelling, a Faecal Coliform (FC) limit of 10,000 No./100ml is also likely to be required in the final effluent. It is likely that a sludge dewatering plant will be included at the treatment plant in order to reduce sludge haulage costs. The decision on whether to include a sludge dewatering plant in the scope of works will be made subject to a life cost analysis. This contract will include the construction of an inlet pump station, the wastewater treatment plant, and a new marine outfall into the estuary of the Owenglin River to replace the existing short outfall. Additional modules will be added to the treatment plant as part the Stage 2 upgrade, which will increase the plant capacity to 9,470 PE. Stage 2 works are expected to be implemented in five yearsโ time and will be separate to this Contract.
DeadlineThe time limit for receipt of tenders was 2008-10-28. The procurement was published on 2008-09-19.
Who? What?- โข Sewer construction work โบ Sewerage work
- โข Sewer construction work โบ Water-treatment work โบ Wastewater pumping station
- โข Sewage-treatment plant construction work โบ Water-treatment plant construction work โบ Wastewater treatment plant construction work
- โข Repair and maintenance of plant โบ Wastewater-plant repair and maintenance work
- โข Engineering design services โบ Engineering design services for mechanical and electrical installations for buildings
- โข รire/Ireland
| Date | Document |
|---|---|
| 2008-09-17 | Contract notice |
Object
Scope of the procurement
Title: Sewerage work
Full text:
โTitle attributed to the contract by the contracting authority: Clifden Sewerage Scheme Upgrade Stage 1: Clifden Waste Water Treatment Plant. Clifden...โ
Place of performance
รire/Ireland ๐๏ธ
Notice metadata
Document type: Contract notice
Nature of contract: Works
Regulation: European Communities, with participation by GPA countries
Original language: English ๐ฃ๏ธ
Procedure
Procedure type: Restricted procedure
Award criteria
The most economic tender
Type of bid: Global tender
Awarding authority type: Regional or local authority
Main activity: General public/services
Contracting authority
Identity
Awarding authority name: Galway County Council
Country: Ireland ๐ฎ๐ช
Contact
Internet address: http://www.galway.ie ๐
Reference
Dates
Publication date: 2008-09-19 ๐
Date received: 2008-09-17 ๐
Date dispatched: 2008-09-17 ๐
Submission deadline: 2008-10-28 ๐
Date for dispatch of contract documents: 2008-10-14 ๐
Identifiers
Notice number (legacy): 241422-2008
OJ-S issue: 182/2008
Object
Common procurement vocabulary (CPV)
Code: Works for complete or part construction and civil engineering work ๐ฆ
Code: Sewerage work ๐ฆ
Code: Wastewater pumping station ๐ฆ
Code: Wastewater treatment plant construction work ๐ฆ
Code: Wastewater-plant repair and maintenance work ๐ฆ
Code: Engineering design services for mechanical and electrical installations for buildings ๐ฆ
Source: OJS 2008/S 182-241422 (2008-09-17)
- Construction work (>20 new procurements)
- Works for complete or part construction and civil engineering work (>20)
- Building construction work (>20)
- Engineering works and construction works (10)
- Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (14)
- Construction work for water projects (1)
- Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry (1)
- Roof works and other special trade construction works (14)