Supply and installation of an LED Video Wall System, to include all associated processors and controllers, training, maintenance and Support. Maintenance services for the existing Bodet LED Video display, and the removal of an existing scoreboard.
Deadline
The time limit for receipt of tenders was 2023-11-17.
The procurement was published on 2023-10-18.
Object Scope of the procurement
Title:
โRequest for Tenders for the Supply, Installation and Maintenance of an LED Video Wallโ
Products/services: Video equipment๐ฆ
Short description:
โSupply and installation of an LED Video Wall System, to include all associated processors and controllers, training, maintenance and Support. Maintenance...โ
Short description
Supply and installation of an LED Video Wall System, to include all associated processors and controllers, training, maintenance and Support. Maintenance services for the existing Bodet LED Video display, and the removal of an existing scoreboard.
Show more
Estimated value excluding VAT: EUR 120 000 ๐ฐ
1๏ธโฃ
Additional products/services: Video monitors๐ฆ
Place of performance: รire/Ireland๐๏ธ
Description of the procurement:
โSupply and installation of an LED Video Wall System, to include all associated processors and controllers, training, maintenance and Support. Maintenance...โ
Description of the procurement
Supply and installation of an LED Video Wall System, to include all associated processors and controllers, training, maintenance and Support. Maintenance services for the existing Bodet LED Video display, and the removal of an existing scoreboard.
Show more Award criteria
Quality criterion (name):
โProposed plan and timetable for delivery, installation, training and documentationโ
Quality criterion (weighting): 10%
Quality criterion (name): LED Video display Screen
Quality criterion (weighting): 15%
Quality criterion (name): warranty, maintenance and ongoing support,
Cost criterion (name): Cost
Cost criterion (weighting): 60%
Scope of the procurement
Estimated total value excluding VAT: EUR 120 000 ๐ฐ
Duration of the contract, framework agreement or dynamic purchasing system
The time frame below is expressed in number of months.
Description
Duration: 6
Procedure Type of procedure
Open procedure
Administrative information
Time limit for receipt of tenders or requests to participate: 2023-11-17
12:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Conditions for opening of tenders: 2023-11-17
12:30 ๐
Complementary information Review body
Name: Sport Ireland
Postal town: Dublin
Country: Ireland ๐ฎ๐ช
Source: OJS 2023/S 204-642152 (2023-10-18)