Installation and commissioning of a 5.9km long, 180mm OD interconnecting pipeline to connect the Lough Carra and Robeen GWS. Upgrade works to the existing Robeen Distribution Network including the following: Replacement of circa 7km of an existing 3โ diameter pipeline within the Robeen GWS Network. Construction of a pressure boosting pumpstation. Rehabilitation of the Robeen reservoir, construction of access road to the Reservoir and site improvement works. Upgrades to the existing pump station at the Robeen Reservoir. Installation of a secondary chlorination system. Installation of domestic meters on all individual connections within the Robeen GWS. Decommissioning of the existing Robeen source and pumping station.
Deadline
The time limit for receipt of tenders was 2023-08-02.
The procurement was published on 2023-07-05.
Object Scope of the procurement
Title: MCC Lough Carra and Robeen GWS Amalgamation Project
Products/services: Pipelaying construction work๐ฆ
Short description:
โInstallation and commissioning of a 5.9km long, 180mm OD interconnecting pipeline to connect the Lough Carra and Robeen GWS. Upgrade works to the existing...โ
Short description
Installation and commissioning of a 5.9km long, 180mm OD interconnecting pipeline to connect the Lough Carra and Robeen GWS. Upgrade works to the existing Robeen Distribution Network including the following: Replacement of circa 7km of an existing 3โ diameter pipeline within the Robeen GWS Network. Construction of a pressure boosting pumpstation. Rehabilitation of the Robeen reservoir, construction of access road to the Reservoir and site improvement works. Upgrades to the existing pump station at the Robeen Reservoir. Installation of a secondary chlorination system. Installation of domestic meters on all individual connections within the Robeen GWS. Decommissioning of the existing Robeen source and pumping station.
Show more
Estimated value excluding VAT: EUR 1 500 000 ๐ฐ
1๏ธโฃ
Additional products/services: Pipelaying construction work๐ฆ
Place of performance: รire/Ireland๐๏ธ
Description of the procurement:
โInstallation and commissioning of a 5.9km long, 180mm OD interconnecting pipeline to connect the Lough Carra and Robeen GWS. Upgrade works to the existing...โ
Description of the procurement
Installation and commissioning of a 5.9km long, 180mm OD interconnecting pipeline to connect the Lough Carra and Robeen GWS. Upgrade works to the existing Robeen Distribution Network including the following: Replacement of circa 7km of an existing 3โ diameter pipeline within the Robeen GWS Network. Construction of a pressure boosting pumpstation. Rehabilitation of the Robeen reservoir, construction of access road to the Reservoir and site improvement works. Upgrades to the existing pump station at the Robeen Reservoir. Installation of a secondary chlorination system. Installation of domestic meters on all individual connections within the Robeen GWS. Decommissioning of the existing Robeen source and pumping station.
Show more Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
Scope of the procurement
Estimated total value excluding VAT: EUR 1 500 000 ๐ฐ
Duration
Start date: 2023-08-28 ๐
End date: 2025-02-28 ๐
Scope of the procurement
Information about European Union funds: 2019-2021 MARWP
Procedure Type of procedure
Open procedure
Administrative information
Time limit for receipt of tenders or requests to participate: 2023-08-02
00:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Conditions for opening of tenders: 2023-08-02
00:30 ๐
Complementary information Review body
Name: High Court
Postal town: Dublin
Country: Ireland ๐ฎ๐ช
Source: OJS 2023/S 130-416024 (2023-07-05)