Title attributed to the contract by the contracting authority: S147 Gorey Inner Relief Road. Wexford County Council wishes to select candidates to tender for the construction of a new road project. The project shall consist of a 2 span Bridge, each span approximately 25,3 metres in length with a 7,3 metres wide carriageway and 3,0 metre footpath/cycle path on either side incorporating public lighting, steel crash barriers and drainage. The bridge crosses a road and railway track at a skew angle of 9 degrees and has a masonry stone finish to blend with existing environment and connects to the 'Old' N11 (R772) via a carriageway 7 ,3 m wide with 3,0 metre footpath/cycle path on both sides and 330 metres in length incorporating a 50 m ICD roundabout, drainage and two backfilled retaining walls 107 metres and 171 metres in length. The carriageway road shall tie in to the existing road via a priority junction. The project will form a trumpet interchange between a proposed relief route and the 'Old' N11 (R772) to the north of Gorey Town. Further information and additional documentation relating to this notice may be available on the eTenders Web Site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=55399.
Deadline
The time limit for receipt of tenders was 2007-11-08.
The procurement was published on 2007-10-02.
Contract notice (2007-10-01) Object Scope of the procurement
Title: Engineering works and construction works
Full text:
โTitle attributed to the contract by the contracting authority: S147 Gorey Inner Relief Road. Wexford County Council wishes to select candidates to tender...โ
Full text
Title attributed to the contract by the contracting authority: S147 Gorey Inner Relief Road. Wexford County Council wishes to select candidates to tender for the construction of a new road project. The project shall consist of a 2 span Bridge, each span approximately 25,3 metres in length with a 7,3 metres wide carriageway and 3,0 metre footpath/cycle path on either side incorporating public lighting, steel crash barriers and drainage. The bridge crosses a road and railway track at a skew angle of 9 degrees and has a masonry stone finish to blend with existing environment and connects to the 'Old' N11 (R772) via a carriageway 7 ,3 m wide with 3,0 metre footpath/cycle path on both sides and 330 metres in length incorporating a 50 m ICD roundabout, drainage and two backfilled retaining walls 107 metres and 171 metres in length. The carriageway road shall tie in to the existing road via a priority junction. The project will form a trumpet interchange between a proposed relief route and the 'Old' N11 (R772) to the north of Gorey Town. Further information and additional documentation relating to this notice may be available on the eTenders Web Site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=55399.
Show more Place of performance
ie000 ๐๏ธ Notice metadata
Document type: Contract notice
Nature of contract: Works
Regulation: European Communities
Original language: English ๐ฃ๏ธ
Procedure
Procedure type: Restricted procedure
Award criteria
The most economic tender
Type of bid: Global tender
Awarding authority type: Regional or local authority
Main activity: General public/services
Contracting authority Identity
Awarding authority name: Wexford County Council
Country: Ireland ๐ฎ๐ช Contact
Internet address: http://wexford.ie๐
Reference Dates
Publication date: 2007-10-02 ๐
Date received: 2007-10-01 ๐
Date dispatched: 2007-10-01 ๐
Submission deadline: 2007-11-08 ๐
Identifiers
Notice number (legacy): 230039-2007
OJ-S issue: 189/2007