The road scheme will comprise of overlay and reconstruction (inlay) and online widening of the existing single carriageway, with the construction of a 2.5m wide cycle track adjacent to the existing road. The total length of the scheme is 2600m. The major elements of the works include the establishment, maintenance, and removal of traffic management for the Works, Fencing, Drainage, Earthworks, Pavement Works, Eir Temporary and Permanent Diversions, Road Restraint Systems, Kerbing, Footways and Cycle path. The Works also include; Earthworks to include excavate and replace, Peat, Rock cut, Surcharge placement and settlement monitoring, Realignment of R262 Regional road junction, and numerous direct accesses onto the N56, Services ducts for Utilities providers and Irish Water Watermain works, Liaising with statutory bodies such as, EIR, the National Parks and Wildlife Services and Fisheries Ireland, Road marking Signing and Roadstuds, Collation of information for inclusion in the safety file for the project. Implementation of Environmental controls and mitigation measures in accordance with the Environmental Operating Plan in Appendix 1/34. Due to the environmentally sensitive nature of the Site (proximity to Freshwater Pearl Mussel Ecology), the Contractor shall ensure environmental Works are carried out.
Deadline
The time limit for receipt of tenders was 2023-11-15.
The procurement was published on 2023-10-05.
Object Scope of the procurement
Title:
โDonegal County Council Road Improvement Works -N56 Letterilly to Kilraine Phase 2 Part 1 and 2โ
Products/services: Construction work for highways, roads๐ฆ
Short description:
โThe road scheme will comprise of overlay and reconstruction (inlay) and online widening of the existing single carriageway, with the construction of a 2.5m...โ
Short description
The road scheme will comprise of overlay and reconstruction (inlay) and online widening of the existing single carriageway, with the construction of a 2.5m wide cycle track adjacent to the existing road. The total length of the scheme is 2600m. The major elements of the works include the establishment, maintenance, and removal of traffic management for the Works, Fencing, Drainage, Earthworks, Pavement Works, Eir Temporary and Permanent Diversions, Road Restraint Systems, Kerbing, Footways and Cycle path. The Works also include; Earthworks to include excavate and replace, Peat, Rock cut, Surcharge placement and settlement monitoring, Realignment of R262 Regional road junction, and numerous direct accesses onto the N56, Services ducts for Utilities providers and Irish Water Watermain works, Liaising with statutory bodies such as, EIR, the National Parks and Wildlife Services and Fisheries Ireland, Road marking Signing and Roadstuds, Collation of information for inclusion in the safety file for the project. Implementation of Environmental controls and mitigation measures in accordance with the Environmental Operating Plan in Appendix 1/34. Due to the environmentally sensitive nature of the Site (proximity to Freshwater Pearl Mussel Ecology), the Contractor shall ensure environmental Works are carried out.
The road scheme will comprise of overlay and reconstruction (inlay) and online widening of the existing single carriageway, with the construction of a 2.5m wide cycle track adjacent to the existing road. The total length of the scheme is 2600m. The major elements of the works include the establishment, maintenance, and removal of traffic management for the Works, Fencing, Drainage, Earthworks, Pavement Works, Eir Temporary and Permanent Diversions, Road Restraint Systems, Kerbing, Footways and Cycle path. The Works also include; Earthworks to include excavate and replace, Peat, Rock cut, Surcharge placement and settlement monitoring, Realignment of R262 Regional road junction, and numerous direct accesses onto the N56, Services ducts for Utilities providers and Irish Water Watermain works, Liaising with statutory bodies such as, EIR, the National Parks and Wildlife Services and Fisheries Ireland, Road marking Signing and Roadstuds, Collation of information for inclusion in the safety file for the project. Implementation of Environmental controls and mitigation measures in accordance with the Environmental Operating Plan in Appendix 1/34. Due to the environmentally sensitive nature of the Site (proximity to Freshwater Pearl Mussel Ecology), the Contractor shall ensure environmental Works are carried out.
Show more Award criteria
Price
Duration
Start date: 2024-02-01 ๐
End date: 2025-02-01 ๐
Legal, economic, financial and technical information Conditions for participation
List and brief description of conditions: See SAQ
Economic and financial standing
Selection criteria as stated in the procurement documents
Technical and professional ability
Selection criteria as stated in the procurement documents
Information about staff responsible for the performance of the contract
Obligation to indicate the names and professional qualifications of the staff assigned to performing the contract
Procedure Type of procedure
Open procedure
Administrative information
Time limit for receipt of tenders or requests to participate: 2023-11-15
16:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Tender must be valid until: 2024-05-13 ๐
Conditions for opening of tenders: 2023-11-15
16:30 ๐
Complementary information Review body
Name: High Court
Postal town: Dublin
Country: Ireland ๐ฎ๐ช
Source: OJS 2023/S 195-610850 (2023-10-05)