Demolition of former Castle Court Hotel on Church street in Cahir and associated structures, walls and concrete slabs. The site is to be fully cleared of all trees, roots and vegetation. 36 linear meters of 5.5m deep secant piles are to be designed and installed, site power ducting from a esb sub station close buy is to be installed, including all required chambers. excavation and filling to formation level is also required across the entire site.
Deadline
The time limit for receipt of tenders was 2023-11-17.
The procurement was published on 2023-10-18.
Object Scope of the procurement
Title: Demolition and Enabling Works for Proposed Car Park, Cahir, Co. Tipperary
Products/services: Demolition, site preparation and clearance work๐ฆ
Short description:
โDemolition of former Castle Court Hotel on Church street in Cahir and associated structures, walls and concrete slabs. The site is to be fully cleared of...โ
Short description
Demolition of former Castle Court Hotel on Church street in Cahir and associated structures, walls and concrete slabs. The site is to be fully cleared of all trees, roots and vegetation. 36 linear meters of 5.5m deep secant piles are to be designed and installed, site power ducting from a esb sub station close buy is to be installed, including all required chambers. excavation and filling to formation level is also required across the entire site.
1๏ธโฃ
Additional products/services: Demolition, site preparation and clearance work๐ฆ
Place of performance: Mid-West ๐๏ธ
Main site or place of performance: Cahir, County Tipperary
Description of the procurement:
โDemolition of former Castle Court Hotel on Church street in Cahir and associated structures, walls and concrete slabs. The site is to be fully cleared of...โ
Description of the procurement
Demolition of former Castle Court Hotel on Church street in Cahir and associated structures, walls and concrete slabs. The site is to be fully cleared of all trees, roots and vegetation. 36 linear meters of 5.5m deep secant piles are to be designed and installed, site power ducting from a esb sub station close buy is to be installed, including all required chambers. excavation and filling to formation level is also required across the entire site.
Show more Award criteria
Price
Duration of the contract, framework agreement or dynamic purchasing system
The time frame below is expressed in number of months.
Description
Duration: 18
Procedure Type of procedure
Open procedure
Administrative information
Time limit for receipt of tenders or requests to participate: 2023-11-17
12:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Conditions for opening of tenders: 2023-11-17
12:30 ๐
Complementary information Information about electronic workflows
Electronic ordering will be used
Electronic invoicing will be accepted
Electronic payment will be used
Review body
Name: High Court
Postal town: Dublin
Country: Ireland ๐ฎ๐ช
URL: https://www.courts.ie/high-court๐ Body responsible for mediation procedures
Name: High Court
Postal town: Dublin
Country: Ireland ๐ฎ๐ช
URL: https://www.courts.ie/high-court๐ Service from which information about the review procedure may be obtained
Name: High Court
Postal town: Dublin
Country: Ireland ๐ฎ๐ช
URL: https://www.courts.ie/high-court๐
Source: OJS 2023/S 204-641789 (2023-10-18)