Construction works for sewage treatment plants, purification plants and refuse incineration plants
Donegal County Council
Gweedore Sewerage Scheme - Design, Build and Operate Scheme. The works include the Design, Construction and Operation of a Wastewater Collection Network, Wastewater Treatment Works, Marine Outfall and Sludge Acceptance and Dewatering facilities. The wastewater treatment works shall be designed for a Stage 1 population equivalent of 7 200. The existing population equivalent from the catchment is approximately 5 000. The sludge acceptance facilities shall have the capacity for importing 110 tonnes of dry solids per annum. The works shall include for the provision of storm water facilities. The wastewater collection network shall involve the provision of sewer lines and intermediate pumping stations. The operation and maintenance period for the collection network, treatment works and sludge reception facilities shall be for 20 years. The works may involve the execution of additional and repetition of similar works and services.
DeadlineThe time limit for receipt of tenders was 2005-09-02. The procurement was published on 2005-07-05.
Who? What?- โข Sewer construction work โบ Sewage work โบ Sewage pumping stations construction work
- โข Sewer construction work โบ Sewage work โบ Sewage outfall construction work
- โข Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry โบ Construction works for sewage treatment plants, purification plants and refuse incineration plants
| Date | Document |
|---|---|
| 2005-06-30 | Contract notice |
| 2005-07-07 | Additional information |
Object
Scope of the procurement
Title: Construction works for sewage treatment plants, purification plants and refuse incineration plants
Full text:
โGweedore Sewerage Scheme - Design, Build and Operate Scheme. The works include the Design, Construction and Operation of a Wastewater Collection Network,...โ
Place of performance
ie011 ๐๏ธ
Notice metadata
Document type: Invitation to tender
Nature of contract: Public works contract
Regulation: European Communities
Original language: English ๐ฃ๏ธ
Procedure
Procedure type: Restricted procedure
Award criteria
The most economic tender
Type of bid: Global tender
Awarding authority type: Local authorities
Contracting authority
Identity
Awarding authority name: Donegal County Council
Country: Ireland ๐ฎ๐ช
Reference
Dates
Publication date: 2005-07-05 ๐
Date received: 2005-06-30 ๐
Date dispatched: 2005-06-30 ๐
Submission deadline: 2005-09-02 ๐
Date for dispatch of contract documents: 2005-09-02 ๐
Identifiers
Notice number (legacy): 125560-2005
OJ-S issue: 127/2005
Object
Common procurement vocabulary (CPV)
Code: Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork ๐ฆ
Code: Sewage pumping stations construction work ๐ฆ
Code: Sewage outfall construction work ๐ฆ
Code: Construction works for sewage treatment plants, purification plants and refuse incineration plants ๐ฆ
Source: OJS 2005/S 127-125560 (2005-06-30)
Object
Notice metadata
Document type: Additional information
Reference
Dates
Publication date: 2005-07-09 ๐
Date received: 2005-07-07 ๐
Date dispatched: 2005-07-07 ๐
Submission deadline: 2005-07-27 ๐
Identifiers
Notice number (legacy): 129091-2005
OJ-S issue: 131/2005
Refers to notice: 125560-2005
Source: OJS 2005/S 131-129091 (2005-07-07)
- Construction work (>20 new procurements)
- Works for complete or part construction and civil engineering work (>20)
- Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (14)
- Construction work for pipelines, communication and power lines
- Ancillary works for pipelines and cables (6)
- Construction, foundation and surface works for highways, roads (10)
- Construction work for railways and cable transport systems
- Construction work for airfields, runways and manoeuvring surfaces
- Flatwork
- Stage construction works