The existing original school building was constructed in 1955, with a small extension added around 2003/2004, and has a floor area of approx. 395 sq. metres and comprises of 2 number mainstream classrooms, staff room, 2 number resource rooms, toilets, office, store, boiler house and circulation areas. The remedial works that require to be carried out at the above school consist of the complete upgrade of the existing oil fired heating centre serving the main school building to a LPG gas fired heating centre complete with wall mounted condensing gas boiler package, including twin wall stainless steel flue connection to the existing masonry chimney, stainless steel liner within the masonry chimney, 80 litre indirect hot water cylinder, low loss flow and return headers, provision of a LPG gas supply to the heating centre from a new external LPG bulk gas storage tank, including the provision of new circulating pumps, thermostatic and frost protection controls, control / isolation valves, air and dirt separators, pipework, pipework insulation, gas safety detection / isolation system including the associated electrical works, builders attendances, including the de-commissioning, disconnection and proper disposal of the redundant mechanical and electrical services, including the existing double skin PVC oil storage tank with a capacity of approx. 1,350 litres, etc.
Deadline
The time limit for receipt of tenders was 2023-08-17.
The procurement was published on 2023-07-20.
Object Scope of the procurement
Title:
โClooneyquinn National School, Killinamor, Elphin, Co Roscommon โ RN:18027T - LPHW Space Heating Upgrade Worksโ
Products/services: Heating plant construction work๐ฆ
Short description:
โThe existing original school building was constructed in 1955, with a small extension added around 2003/2004, and has a floor area of approx. 395 sq. metres...โ
Short description
The existing original school building was constructed in 1955, with a small extension added around 2003/2004, and has a floor area of approx. 395 sq. metres and comprises of 2 number mainstream classrooms, staff room, 2 number resource rooms, toilets, office, store, boiler house and circulation areas. The remedial works that require to be carried out at the above school consist of the complete upgrade of the existing oil fired heating centre serving the main school building to a LPG gas fired heating centre complete with wall mounted condensing gas boiler package, including twin wall stainless steel flue connection to the existing masonry chimney, stainless steel liner within the masonry chimney, 80 litre indirect hot water cylinder, low loss flow and return headers, provision of a LPG gas supply to the heating centre from a new external LPG bulk gas storage tank, including the provision of new circulating pumps, thermostatic and frost protection controls, control / isolation valves, air and dirt separators, pipework, pipework insulation, gas safety detection / isolation system including the associated electrical works, builders attendances, including the de-commissioning, disconnection and proper disposal of the redundant mechanical and electrical services, including the existing double skin PVC oil storage tank with a capacity of approx. 1,350 litres, etc.
Show more
Estimated value excluding VAT: EUR 150 000 ๐ฐ
The existing original school building was constructed in 1955, with a small extension added around 2003/2004, and has a floor area of approx. 395 sq. metres and comprises of 2 number mainstream classrooms, staff room, 2 number resource rooms, toilets, office, store, boiler house and circulation areas. The remedial works that require to be carried out at the above school consist of the complete upgrade of the existing oil fired heating centre serving the main school building to a LPG gas fired heating centre complete with wall mounted condensing gas boiler package, including twin wall stainless steel flue connection to the existing masonry chimney, stainless steel liner within the masonry chimney, 80 litre indirect hot water cylinder, low loss flow and return headers, provision of a LPG gas supply to the heating centre from a new external LPG bulk gas storage tank, including the provision of new circulating pumps, thermostatic and frost protection controls, control / isolation valves, air and dirt separators, pipework, pipework insulation, gas safety detection / isolation system including the associated electrical works, builders attendances, including the de-commissioning, disconnection and proper disposal of the redundant mechanical and electrical services, including the existing double skin PVC oil storage tank with a capacity of approx. 1,350 litres, etc.
Show more Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
Scope of the procurement
Estimated total value excluding VAT: EUR 150 000 ๐ฐ
Duration
Start date: 2023-08-17 ๐
End date: 2024-08-31 ๐
Procedure Type of procedure
Open procedure
Administrative information
Time limit for receipt of tenders or requests to participate: 2023-08-17
14:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
The time frame below is expressed in number of months.
Minimum time frame during which the tenderer must maintain the tender: 6
Conditions for opening of tenders: 2023-08-17
14:30 ๐
Conditions for opening of tenders (place):
โHeavey Kenny Associates, 6 Liosban Business Park, 23E First Floor, Tuam Road, Galway. H91E9KNโ
Conditions for opening of tenders (Information about authorised persons and opening procedure): by John Carr, Managing Director of HKA
Complementary information Review body
Name: Heavey Kenny Associates
Postal town: Galway
Country: Ireland ๐ฎ๐ช
Source: OJS 2023/S 141-450173 (2023-07-20)