Medite requires the re-placement / re-surfacing of sections of internal perimeter road โ Pu-061 at their Medite facility. This Scope of works will be broken into 3 lots 1. Concrete slip road to Fuel + Chip yard 2. Concreting of road sections @ Log Yard junction with 3. Asphalt resurfacing sections of perimeter road Site Location: Medite, Redmondstown, Clonmel, Co. Tipperary E91 V584. It is expected that the Concrete works will start by end of November 2025 (before weather gets too cold) Please note that the successful contractor is responsible for the Supply of all Materials, appropriate Plant and Labour to complete the works as set-out in this Scope of Works. Client: Medite - Redmondstown, Clonmel, Co. Tipperary. Contact: Ivan Cuddihyโ 052 61 82341 PSDP Medite - Redmondstown, Clonmel, Co. Tipperary. Contact: Ivan Cuddihy โ 052 61 82341 PSCS Successful contractor Contractorโs Responsibilities: The successful candidate contractor is responsible for the following: 1. All Plant + Equipment to carry out works, temporary, mobile or fixed. 2. Supply + delivery of above and all materials to site and proper storage / securing thereof. 3. Create temporary bypass roads during road works, appropriate to the type of vehicles will be using them and meeting all safety standards for such. 4. Preliminaries and Insurance 5. Health + Safety โ PSCS role 6. Traffic Management Scope of Works will include the following steps: 1. Appointment of PSCS - The PSCS will co-ordinate all Safety activities between main contractor and sub-contractors, and among the latter. 2. Preliminaries and Insurance - The Contractor is responsible for all Preliminaries and Insurance costs, associated with the carrying out of all works as set out in this SOW for the. 3. Health + Safety - The Contractor is responsible for all Health + Safety associated with the carrying out of all works as set out in the above SoW works for all roadworks. Appropriate cordoning and barriers will be required, to clearly delineate the works site. A Preliminary H+S plan must be submitted with the bid. 4. Scanning of proposed works area - All areas / sections proposed for excavation, planning, etc. need to be scanned to identify any underground service, before any works begin. 5. Quality Assurance - For concrete works, after 3 weeks setting, cube test key areas to European Standard IS/EN 206-1 / BS EN 12390-3. 6. Traffic management - Contractor is to minimise the disruption to site traffic, for duration of works. A traffic management plan will be required to minimize the impact on existing traffic (Articulated trucks, lorries, Volvo log-grabbers, front-loaders, tractors, site maintenance vehicles, etc.) For asphalt re-surfacing, where feasible, only one side (lane) of road is to be closed + paved at any one time, allowing the other side to remain open to allow traffic through. 7. Waste Removal - All excavation waste (tarmac scrapings, road cut stone/gravel, etc.) removal from site to a licensed waste contractor (company name to be provided). No material to be stored on site. ***Please see attached tender document for the full scope of works***
Deadline
The time limit for receipt of tenders was 2025-11-07.
The procurement was published on 2025-10-17.
Contract notice (2025-10-17) Object Scope of the procurement
Title: Request for Tender for Perimeter Road Section Resurfacing (incl. Asphalt and Concrete work) at MEDITE Europe DAC โ25
Short description:
โMedite requires the re-placement / re-surfacing of sections of internal perimeter road โ Pu-061 at their Medite facility. This Scope of works will be broken...โ
Short description
Medite requires the re-placement / re-surfacing of sections of internal perimeter road โ Pu-061 at their Medite facility. This Scope of works will be broken into 3 lots 1. Concrete slip road to Fuel + Chip yard 2. Concreting of road sections @ Log Yard junction with 3. Asphalt resurfacing sections of perimeter road Site Location: Medite, Redmondstown, Clonmel, Co. Tipperary E91 V584. It is expected that the Concrete works will start by end of November 2025 (before weather gets too cold) Please note that the successful contractor is responsible for the Supply of all Materials, appropriate Plant and Labour to complete the works as set-out in this Scope of Works. Client: Medite - Redmondstown, Clonmel, Co. Tipperary. Contact: Ivan Cuddihyโ 052 61 82341 PSDP Medite - Redmondstown, Clonmel, Co. Tipperary. Contact: Ivan Cuddihy โ 052 61 82341 PSCS Successful contractor Contractorโs Responsibilities: The successful candidate contractor is responsible for the following: 1. All Plant + Equipment to carry out works, temporary, mobile or fixed. 2. Supply + delivery of above and all materials to site and proper storage / securing thereof. 3. Create temporary bypass roads during road works, appropriate to the type of vehicles will be using them and meeting all safety standards for such. 4. Preliminaries and Insurance 5. Health + Safety โ PSCS role 6. Traffic Management Scope of Works will include the following steps: 1. Appointment of PSCS - The PSCS will co-ordinate all Safety activities between main contractor and sub-contractors, and among the latter. 2. Preliminaries and Insurance - The Contractor is responsible for all Preliminaries and Insurance costs, associated with the carrying out of all works as set out in this SOW for the. 3. Health + Safety - The Contractor is responsible for all Health + Safety associated with the carrying out of all works as set out in the above SoW works for all roadworks. Appropriate cordoning and barriers will be required, to clearly delineate the works site. A Preliminary H+S plan must be submitted with the bid. 4. Scanning of proposed works area - All areas / sections proposed for excavation, planning, etc. need to be scanned to identify any underground service, before any works begin. 5. Quality Assurance - For concrete works, after 3 weeks setting, cube test key areas to European Standard IS/EN 206-1 / BS EN 12390-3. 6. Traffic management - Contractor is to minimise the disruption to site traffic, for duration of works. A traffic management plan will be required to minimize the impact on existing traffic (Articulated trucks, lorries, Volvo log-grabbers, front-loaders, tractors, site maintenance vehicles, etc.) For asphalt re-surfacing, where feasible, only one side (lane) of road is to be closed + paved at any one time, allowing the other side to remain open to allow traffic through. 7. Waste Removal - All excavation waste (tarmac scrapings, road cut stone/gravel, etc.) removal from site to a licensed waste contractor (company name to be provided). No material to be stored on site. ***Please see attached tender document for the full scope of works***
Show more
Type of contract: Works
Products/services: Road construction works๐ฆ
Estimated value excluding VAT: 550 000 EUR ๐ฐ
Description
Description of the procurement:
โMedite requires the re-placement / re-surfacing of sections of internal perimeter road โ Pu-061 at their Medite facility. This Scope of works will be broken...โ
Description of the procurement
Medite requires the re-placement / re-surfacing of sections of internal perimeter road โ Pu-061 at their Medite facility. This Scope of works will be broken into 3 lots 1. Concrete slip road to Fuel + Chip yard 2. Concreting of road sections @ Log Yard junction with 3. Asphalt resurfacing sections of perimeter road Site Location: Medite, Redmondstown, Clonmel, Co. Tipperary E91 V584. It is expected that the Concrete works will start by end of November 2025 (before weather gets too cold) Please note that the successful contractor is responsible for the Supply of all Materials, appropriate Plant and Labour to complete the works as set-out in this Scope of Works. Client: Medite - Redmondstown, Clonmel, Co. Tipperary. Contact: Ivan Cuddihyโ 052 61 82341 PSDP Medite - Redmondstown, Clonmel, Co. Tipperary. Contact: Ivan Cuddihy โ 052 61 82341 PSCS Successful contractor Contractorโs Responsibilities: The successful candidate contractor is responsible for the following: 1. All Plant + Equipment to carry out works, temporary, mobile or fixed. 2. Supply + delivery of above and all materials to site and proper storage / securing thereof. 3. Create temporary bypass roads during road works, appropriate to the type of vehicles will be using them and meeting all safety standards for such. 4. Preliminaries and Insurance 5. Health + Safety โ PSCS role 6. Traffic Management Scope of Works will include the following steps: 1. Appointment of PSCS - The PSCS will co-ordinate all Safety activities between main contractor and sub-contractors, and among the latter. 2. Preliminaries and Insurance - The Contractor is responsible for all Preliminaries and Insurance costs, associated with the carrying out of all works as set out in this SOW for the. 3. Health + Safety - The Contractor is responsible for all Health + Safety associated with the carrying out of all works as set out in the above SoW works for all roadworks. Appropriate cordoning and barriers will be required, to clearly delineate the works site. A Preliminary H+S plan must be submitted with the bid. 4. Scanning of proposed works area - All areas / sections proposed for excavation, planning, etc. need to be scanned to identify any underground service, before any works begin. 5. Quality Assurance - For concrete works, after 3 weeks setting, cube test key areas to European Standard IS/EN 206-1 / BS EN 12390-3. 6. Traffic management - Contractor is to minimise the disruption to site traffic, for duration of works. A traffic management plan will be required to minimize the impact on existing traffic (Articulated trucks, lorries, Volvo log-grabbers, front-loaders, tractors, site maintenance vehicles, etc.) For asphalt re-surfacing, where feasible, only one side (lane) of road is to be closed + paved at any one time, allowing the other side to remain open to allow traffic through. 7. Waste Removal - All excavation waste (tarmac scrapings, road cut stone/gravel, etc.) removal from site to a licensed waste contractor (company name to be provided). No material to be stored on site. ***Please see attached tender document for the full scope of works***
Show more
Additional products/services: Road-maintenance works๐ฆ
Additional products/services: Resurfacing works๐ฆ
Additional products/services: Foundation work for roads๐ฆ
Additional products/services: Road-repair works๐ฆ
Additional products/services: Roadworks๐ฆ
Place of performance: Dublin๐๏ธ
Duration: 1 (MONTH)
The time frame below is expressed in number of months.
Title
Lot Identification Number: LOT-0001
Procedure Type of procedure
Open procedure โ Administrative information
Time limit for receipt of tenders or requests to participate: 2025-11-07 15:00:00 ๐
Conditions for opening of tenders: 2025-11-07 15:30:00 ๐
Conditions for opening of tenders (place): https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=6796029
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Minimum time frame during which the tenderer must maintain the tender: 4
Complementary information Review body
Name: The High Court of Ireland
National registration number: The High Court of Ireland
Postal address: Four Courts, Inns Quay, Dublin 7
Postal code: D07 WDX8
Postal town: Dublin
Region: Dublin๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: highcourtcentraloffice@courts.ie๐ง
Phone: +353 1 8886000๐ Service from which information about the review procedure may be obtained
Name: The High Court of Ireland
National registration number: The High Court of Ireland
Postal address: Four Courts, Inns Quay, Dublin 7
Postal code: D07 WDX8
Postal town: Dublin
Region: Dublin๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: highcourtcentraloffice@courts.ie๐ง
Phone: +353 1 8886000๐ Information about electronic workflows
Electronic invoicing will be accepted
Electronic ordering will be used
Electronic payment will be used
Source: OJS 2025/S 201-688353 (2025-10-17)