The proposed works include Ground Investigation within the M4/N4 Westbound Bus Priority Measures Project extents along the existing M4/N4 corridor between Junction 5 Leixlip and Junction 7 Maynooth along with adjacent lands and roads within a defined boundary. The total area to be made available for the ground investigation works lies with the scheme boundary and includes the motorway corridor and adjacent junctions. The section under consideration for this commission is approximately 7.8km in length and the majority of proposed works under this contract are located close to the existing road infrastructure.
Deadline
The time limit for receipt of tenders was 2025-06-30.
The procurement was published on 2025-05-21.
Contract notice (2025-05-21) Object Scope of the procurement
Title: M4 Westbound Bus Priority Measures - Ground Investigation
Short description:
โThe proposed works include Ground Investigation within the M4/N4 Westbound Bus Priority Measures Project extents along the existing M4/N4 corridor between...โ
Short description
The proposed works include Ground Investigation within the M4/N4 Westbound Bus Priority Measures Project extents along the existing M4/N4 corridor between Junction 5 Leixlip and Junction 7 Maynooth along with adjacent lands and roads within a defined boundary. The total area to be made available for the ground investigation works lies with the scheme boundary and includes the motorway corridor and adjacent junctions. The section under consideration for this commission is approximately 7.8km in length and the majority of proposed works under this contract are located close to the existing road infrastructure.
Show more
Type of contract: Works
Products/services: Ground investigation work๐ฆ
Estimated value excluding VAT: 200 000 EUR ๐ฐ
Description
Description of the procurement:
โThe proposed works include Ground Investigation within the M4/N4 Westbound Bus Priority Measures Project extents along the existing M4/N4 corridor between...โ
Description of the procurement
The proposed works include Ground Investigation within the M4/N4 Westbound Bus Priority Measures Project extents along the existing M4/N4 corridor between Junction 5 Leixlip and Junction 7 Maynooth along with adjacent lands and roads within a defined boundary. The total area to be made available for the ground investigation works lies with the scheme boundary and includes the motorway corridor and adjacent junctions. The section under consideration for this commission is approximately 7.8km in length and the majority of proposed works under this contract are located close to the existing road infrastructure.
Show more
Additional products/services: Ground investigation services๐ฆ
Place of performance: Mid-East๐๏ธ Duration
Start date: 2025-08-05 ๐
End date: 2026-01-05 ๐
Title
Lot Identification Number: LOT-0001
Procedure Type of procedure
Open procedure โ Administrative information
Time limit for receipt of tenders or requests to participate: 2025-06-30 17:00:00 ๐
Conditions for opening of tenders: 2025-07-01 00:00:00 ๐
Conditions for opening of tenders (place): https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=5722965
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Minimum time frame during which the tenderer must maintain the tender: 180
Complementary information Review body
Name: The High Court of Ireland
National registration number: The High Court of Ireland
Postal address: Four Courts, Inns Quay, Dublin 7
Postal code: D07 WDX8
Postal town: Dublin
Region: Dublin๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: highcourtcentraloffice@courts.ie๐ง
Phone: +353 1 8886000๐ Service from which information about the review procedure may be obtained
Name: Kildare County Council_385
National registration number: 0013247i
Postal address: Kildare County Council, Head Office รras Chill Dara, Devoy Park, Naas, Co. Kildare.
Postal code: W91 X77F
Postal town: Naas
Region: Mid-East๐๏ธ
Country: Ireland ๐ฎ๐ช
E-mail: ktynan@kildarenrdo.com๐ง
Phone: 045988900๐
URL: http://www.kildarecoco.ie๐ Information about electronic workflows
Electronic invoicing will be accepted
Electronic ordering will be used
Electronic payment will be used
Source: OJS 2025/S 099-335211 (2025-05-21)