Galway County Council NRPO General Description of Works The proposed works of the Athenry Northern Relief Road – Western Section, which comprises approximately 940m of 10.5m wide carriageway, a roundabout, paths, cycleway, surface water drainage, ponds, street lighting, traffic calming islands, hedging, signage, line marking, accomodation works and all associated works. The proposed works take place on a green field site, while connecting to the existing road network at Ballygarraun South, at the existing roundabout (at Presentation College Athenry) and at the junction of the L3103 and Athenry Northern Relief Road – Centre Section at Ballygarraun South. The L3103, will terminate at this location on completion of the Athenry Northern Relief Road – West Section. The new junction layout at this location is part of these works. A new traffic calming island and pedestrian crossing will be required to be constructed on the Athenry Northern Relief Road – Centre section with modifications required to the paths, cycleway, and kerb lines to facilitate. A turning area will be required to be constructed on the closed section of the L3103, with kerbing, surface drainage, signage, barriers, and road surfacing included. All other associated works required are also included. Scope of Works The scope of Works involves everything that is contained within the Works Requirements. As a guide, the Works comprise, but are not limited to, the following: • Acceptance of Appointment as Project Supervisor for the Construction Stage (PSCS) and perform the duties of PSCS in accordance with the Health and Safety Authority requirements. • Temporary Traffic Management including provision of pedestrian and vehicular access to all premises affected by the Works. • Site Clearance. • Temporary and permanent fencing. (the site has been fenced - a small bit of permanent fencing outstanding) • Drainage and services. • Drainage and utilities. • Surface Water Drainage. • Proposed utilities: Installation of communications and electrical ducting and connection to existing. • Earthworks. • Pavements: Re-alignment and new surfacing on existing roads. • Kerbs, Footways and Paved Areas, including proposed cycle tracks, renewed footpaths, tactile paving, etc. • Traffic Signs and Road Markings throughout scheme extents. • Public Lighting including the re-location of existing lighting columns. • Landscaping including Top soiling, seeding, tree clearing. • Accommodation Works as required. • All other Works as described or inferred on the drawings or the Works.
Deadline
The time limit for receipt of tenders was 2025-02-28.
The procurement was published on 2025-01-15.
Contract notice (2025-01-15) Object Scope of the procurement
Title: Athenry Northern Relief Road – Western Section
Short description:
“Galway County Council NRPO General Description of Works The proposed works of the Athenry Northern Relief Road – Western Section, which comprises...”
Short description
Galway County Council NRPO General Description of Works The proposed works of the Athenry Northern Relief Road – Western Section, which comprises approximately 940m of 10.5m wide carriageway, a roundabout, paths, cycleway, surface water drainage, ponds, street lighting, traffic calming islands, hedging, signage, line marking, accomodation works and all associated works. The proposed works take place on a green field site, while connecting to the existing road network at Ballygarraun South, at the existing roundabout (at Presentation College Athenry) and at the junction of the L3103 and Athenry Northern Relief Road – Centre Section at Ballygarraun South. The L3103, will terminate at this location on completion of the Athenry Northern Relief Road – West Section. The new junction layout at this location is part of these works. A new traffic calming island and pedestrian crossing will be required to be constructed on the Athenry Northern Relief Road – Centre section with modifications required to the paths, cycleway, and kerb lines to facilitate. A turning area will be required to be constructed on the closed section of the L3103, with kerbing, surface drainage, signage, barriers, and road surfacing included. All other associated works required are also included. Scope of Works The scope of Works involves everything that is contained within the Works Requirements. As a guide, the Works comprise, but are not limited to, the following: • Acceptance of Appointment as Project Supervisor for the Construction Stage (PSCS) and perform the duties of PSCS in accordance with the Health and Safety Authority requirements. • Temporary Traffic Management including provision of pedestrian and vehicular access to all premises affected by the Works. • Site Clearance. • Temporary and permanent fencing. (the site has been fenced - a small bit of permanent fencing outstanding) • Drainage and services. • Drainage and utilities. • Surface Water Drainage. • Proposed utilities: Installation of communications and electrical ducting and connection to existing. • Earthworks. • Pavements: Re-alignment and new surfacing on existing roads. • Kerbs, Footways and Paved Areas, including proposed cycle tracks, renewed footpaths, tactile paving, etc. • Traffic Signs and Road Markings throughout scheme extents. • Public Lighting including the re-location of existing lighting columns. • Landscaping including Top soiling, seeding, tree clearing. • Accommodation Works as required. • All other Works as described or inferred on the drawings or the Works.
Show more
Type of contract: Works
Products/services: Site preparation work📦
Estimated value excluding VAT: 1 800 000 EUR 💰
Description
Description of the procurement:
“Galway County Council NRPO General Description of Works The proposed works of the Athenry Northern Relief Road – Western Section, which comprises...”
Description of the procurement
Galway County Council NRPO General Description of Works The proposed works of the Athenry Northern Relief Road – Western Section, which comprises approximately 940m of 10.5m wide carriageway, a roundabout, paths, cycleway, surface water drainage, ponds, street lighting, traffic calming islands, hedging, signage, line marking, accomodation works and all associated works. The proposed works take place on a green field site, while connecting to the existing road network at Ballygarraun South, at the existing roundabout (at Presentation College Athenry) and at the junction of the L3103 and Athenry Northern Relief Road – Centre Section at Ballygarraun South. The L3103, will terminate at this location on completion of the Athenry Northern Relief Road – West Section. The new junction layout at this location is part of these works. A new traffic calming island and pedestrian crossing will be required to be constructed on the Athenry Northern Relief Road – Centre section with modifications required to the paths, cycleway, and kerb lines to facilitate. A turning area will be required to be constructed on the closed section of the L3103, with kerbing, surface drainage, signage, barriers, and road surfacing included. All other associated works required are also included. Scope of Works The scope of Works involves everything that is contained within the Works Requirements. As a guide, the Works comprise, but are not limited to, the following: • Acceptance of Appointment as Project Supervisor for the Construction Stage (PSCS) and perform the duties of PSCS in accordance with the Health and Safety Authority requirements. • Temporary Traffic Management including provision of pedestrian and vehicular access to all premises affected by the Works. • Site Clearance. • Temporary and permanent fencing. (the site has been fenced - a small bit of permanent fencing outstanding) • Drainage and services. • Drainage and utilities. • Surface Water Drainage. • Proposed utilities: Installation of communications and electrical ducting and connection to existing. • Earthworks. • Pavements: Re-alignment and new surfacing on existing roads. • Kerbs, Footways and Paved Areas, including proposed cycle tracks, renewed footpaths, tactile paving, etc. • Traffic Signs and Road Markings throughout scheme extents. • Public Lighting including the re-location of existing lighting columns. • Landscaping including Top soiling, seeding, tree clearing. • Accommodation Works as required. • All other Works as described or inferred on the drawings or the Works.
Procedure Type of procedure
Open procedure ✅ Administrative information
Time limit for receipt of tenders or requests to participate: 2025-02-28 16:00:00 📅
Conditions for opening of tenders: 2025-03-03 00:00:00 📅
Conditions for opening of tenders (place): https://www.etenders.gov.ie/epps/cft/prepareViewCfTWS.do?resourceId=4955373
Languages in which tenders or requests to participate may be submitted: English 🗣️
Minimum time frame during which the tenderer must maintain the tender: 6
Complementary information Review body
Name: The High Court of Ireland
National registration number: The High Court of Ireland
Postal address: Four Courts, Inns Quay, Dublin 7
Postal code: D07 WDX8
Postal town: Dublin
Region: Dublin🏙️
Country: Ireland 🇮🇪
E-mail: highcourtcentraloffice@courts.ie📧
Phone: +353 1 8886000📞 Review procedure
Precise information on deadline(s) for review procedures:
“Please see tender documents for all deadlines” Information about electronic workflows
Electronic invoicing will be accepted
Electronic payment will be used
Source: OJS 2025/S 011-032314 (2025-01-15)