South Kerry Greenway - Design and Build Contract
Kerry County Council_1204
Kerry County Council, with the support of Transport Infrastructure Ireland (TII), are developing the South Kerry Greenway which involves the construction of a 27 km greenway between Glenbeigh and Cahersiveen Co. Kerry. The route has been split up into several construction packages with Kerry County Council undertaking the construction of some of the works under direct labour. It is currently anticipated that the scope of this Design and Build Contract will be related to the following elements of the South Kerry Greenway. Section 2 Griffins Cottage to Kells Post Office (CH 18200 to CH 25650m) Cahersiveen (Valentia Estuary) Bridge (CH 5180m) Gleensk Viaduct (CH 21,800m) N70 Overbridge (CH 26,870m) N70 Underpass (CH 14,680m) Kells Car Park (CH 18,200m) The works requirements for the above sections will encompass all works necessary to complete the greenway including, design, PSDP Services, PSCS Services, environmental management, earthworks, drainage, pavement, fencing, landscaping, signage, slope stabilization, retaining wall construction, rehabilitation of existing structures, construction of new structures, road realignment, traffic management and all other services necessary to complete the works. The Design and Build Section contains a number of bridge structures and tunnels of historical and cultural significance. It is a requirement that all the conditions imposed by the Planning Consent, the Environmental Impact Assessment Report, the associated Schedule of Environmental Commitments, and the Natura Impact Statement, and any Wildlife and Derogation Licenses are complied with in full. The greenway route traverses or is in close proximity to several Special Areas of Conservation (SAC) and Special Protection Areas (SPA). The project is subject to strict environmental controls in accordance with the plans, particulars and conditions associated with the project consents. Environmental management will form a key part of the successful execution of this project. In particular, it is a requirement that construction is carried out in accordance with the Construction Environmental Management Plan (CEMP), other environmental management plans required under the EIAR and NIS, relevant Wildlife and derogation licenses to create and manage a suitable receiving environment for the Kerry Slug in the area affected by the proposed greenway. A series of advance works contracts are currently being completed. These include the construction of a Gabion Trial Section at Mountain Stage and Site Clearance and Temporary Fencing. Candidates that are pre-qualified and shortlisted on the basis of their responses to this first stage Pre-Qualification may be invited to participate in the second stage Tender. That tender competition will be awarded on the basis of the Most Economically Advantageous Tender based on Award Criteria made up of 70 (Price) and 30 (Quality).
DeadlineThe time limit for receipt of tenders was 2024-03-01. The procurement was published on 2024-01-26.
Who? What? Where?- โข รire/Ireland
| Date | Document |
|---|---|
| 2024-01-26 | Contract notice |
| 2024-02-02 | Contract notice |
| 2024-02-13 | Contract notice |
Object
Scope of the procurement
Title: South Kerry Greenway - Design and Build Contract
Short description:
โKerry County Council, with the support of Transport Infrastructure Ireland (TII), are developing the South Kerry Greenway which involves the construction of...โ
Type of contract: Works
Products/services: Construction work ๐ฆ
Estimated value excluding VAT: 20 000 000 EUR ๐ฐ
Information about lots
Tenders may be submitted for maximum number of lots: 0
Description
Internal identifier: 0
Estimated value excluding VAT: 20 000 000 EUR ๐ฐ
Description of the procurement:
โKerry County Council, with the support of Transport Infrastructure Ireland (TII), are developing the South Kerry Greenway which involves the construction of...โ
Type of contract: Works
Products/services: Construction work ๐ฆ
Approach to reducing environmental impacts: Other
Title
Lot Identification Number: LOT-0001
Procedure
Type of procedure
Restricted procedure โ
Legal basis: Directive 2014/24/EU
Administrative information
Time limit for receipt of tenders or requests to participate: 2024-03-01 15:00:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Tendering terms
Tenderers may submit more than one tender
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Electronic invoicing: Required
Electronic ordering will be used โ
Electronic payment will be used โ
Legal, economic, financial and technical information
Conditions for participation
List and brief description of rules and criteria:
โPlease Refer to Tender Documents for Selection Criteria.โ
Exclusion ground: nati-ground
Description of exclusion grounds:
โSee Tender Documents for Full List of Exclusion Grounds.โ
Contracting authority
Name and addresses
Name: Kerry County Council_1204
National registration number: 0563711D
Postal address: County Buildings Rathass
Postal code: V92H7VT
Postal town: Tralee
Country: Ireland ๐ฎ๐ช
E-mail: cpcu@kerrycoco.ie ๐ง
Phone: 066 7183500 ๐
Information exchange endpoint (URL): https://www.kerrycoco.ie ๐
Address of the buyer profile: https://www.kerrycoco.ie ๐
Type of the contracting authority
Regional or local authority
Main activity
General public services
Communication
Documents URL: https://www.etenders.gov.ie/epps/cft/listContractDocuments.do?resourceId=3005250 ๐
Participation URL: https://www.etenders.gov.ie/epps/eawarding/showTenderList.do?resourceId=3005250 ๐
Electronic submission: Required
Complementary information
Review body
Name: The High Court of Ireland
National registration number: The High Court of Ireland
Department: The High Court of Ireland
Postal address: Four Courts, Inns Quay, Dublin 7
Postal code: D07 WDX8
Postal town: Dublin
Country: Ireland ๐ฎ๐ช
E-mail: highcourtcentraloffice@courts.ie ๐ง
Phone: +353 1 8886000 ๐
Information about electronic workflows
Electronic invoicing will be accepted
Electronic ordering will be used
Electronic payment will be used
Source: OJS 2024/S 021-061716 (2024-01-26)
Object
Scope of the procurement
Short description:
โKerry County Council, with the support of Transport Infrastructure Ireland (TII), are developing the South Kerry Greenway which involves the construction of...โ
Estimated value excluding VAT: 20 000 000 EUR ๐ฐ
Description
20 000 000 EUR ๐ฐ
Description of the procurement:
โKerry County Council, with the support of Transport Infrastructure Ireland (TII), are developing the South Kerry Greenway which involves the construction of...โ
Changes
Other additional information
โText amended in description.โ
Information about modifications
Version of the previous notice to be changed: 6ad13f0f-a6fd-4f62-ba43-e777945adbb5-01
Source: OJS 2024/S 026-077028 (2024-02-02)
Object
Scope of the procurement
Estimated value excluding VAT: 20 000 000 EUR ๐ฐ
Description
20 000 000 EUR ๐ฐ
Procedure
Administrative information
Time limit for receipt of tenders or requests to participate: 2024-03-08 15:00:00 ๐
Contracting authority
Name and addresses
Phone: 0667183500 ๐
URL: https://www.kerrycoco.ie ๐
Changes
Other additional information
โResponse Deadline extended to March 8th 2024 at 3pm.โ
Information about modifications
Version of the previous notice to be changed: c0e5d2bc-2da9-4f33-b8b3-91ec2926c7f9-02
Source: OJS 2024/S 032-094024 (2024-02-13)