The nature and extent of the proposed development is outlined under points AโD below: (A) Refurbishment of Comerford House which is a Protected Structure (Ref. No. 4003), to provide exhibition spaces, visitor and staff facilities for Galway City Museum. Works will include piling, flood protection works, general upgrade, including refurbishment of internal and external finishes (incl. lime plasterworks), upgrade of existing structure, re-roofing of existing building, museum standard M and E services. Gross Floor Area of 25m2 (B) Construction of a 3- storey steel framed and CLT/Glulam building on piled foundations above the archaeological site adjoining the Spanish Arch, a National Monument, and within a flood zone. Connected to Comerford House it will provide exhibition spaces, storage and visitor facilities, including a new lift and stair, and museum standard M and E services for Galway City Museum. Gross Floor Area of 516m2 (C) Remodelling of hard and soft landscaping within โMuseum Close' between the Spanish Arch, and the existing Galway City Museum, together with local elements of hard landscaping in front of Comerford House and the Spanish Arch within the Fish Market. (D) Alterations to the existing Galway City Museum building include: new exit door from reception lobby, with new steps and Part M platform lift, new canopies and display windows, relocated ESB sub-station and enclosure.
Deadline
The time limit for receipt of tenders was 2024-08-22.
The procurement was published on 2024-07-26.
Contract notice (2024-07-26) Object Scope of the procurement
Title: Galway City Council - Galway City Museum Extension - Prequalification
Short description:
โThe nature and extent of the proposed development is outlined under points AโD below: (A) Refurbishment of Comerford House which is a Protected Structure...โ
Short description
The nature and extent of the proposed development is outlined under points AโD below: (A) Refurbishment of Comerford House which is a Protected Structure (Ref. No. 4003), to provide exhibition spaces, visitor and staff facilities for Galway City Museum. Works will include piling, flood protection works, general upgrade, including refurbishment of internal and external finishes (incl. lime plasterworks), upgrade of existing structure, re-roofing of existing building, museum standard M and E services. Gross Floor Area of 25m2 (B) Construction of a 3- storey steel framed and CLT/Glulam building on piled foundations above the archaeological site adjoining the Spanish Arch, a National Monument, and within a flood zone. Connected to Comerford House it will provide exhibition spaces, storage and visitor facilities, including a new lift and stair, and museum standard M and E services for Galway City Museum. Gross Floor Area of 516m2 (C) Remodelling of hard and soft landscaping within โMuseum Close' between the Spanish Arch, and the existing Galway City Museum, together with local elements of hard landscaping in front of Comerford House and the Spanish Arch within the Fish Market. (D) Alterations to the existing Galway City Museum building include: new exit door from reception lobby, with new steps and Part M platform lift, new canopies and display windows, relocated ESB sub-station and enclosure.
Show more
Type of contract: Works
Products/services: Construction work๐ฆ
Estimated value excluding VAT: 10 000 000 EUR ๐ฐ
Information about lots
Tenders may be submitted for maximum number of lots: 0
Description
Description of the procurement:
โThe nature and extent of the proposed development is outlined under points AโD below: (A) Refurbishment of Comerford House which is a Protected Structure...โ
Description of the procurement
The nature and extent of the proposed development is outlined under points AโD below: (A) Refurbishment of Comerford House which is a Protected Structure (Ref. No. 4003), to provide exhibition spaces, visitor and staff facilities for Galway City Museum. Works will include piling, flood protection works, general upgrade, including refurbishment of internal and external finishes (incl. lime plasterworks), upgrade of existing structure, re-roofing of existing building, museum standard M and E services. Gross Floor Area of 25m2 (B) Construction of a 3- storey steel framed and CLT/Glulam building on piled foundations above the archaeological site adjoining the Spanish Arch, a National Monument, and within a flood zone. Connected to Comerford House it will provide exhibition spaces, storage and visitor facilities, including a new lift and stair, and museum standard M and E services for Galway City Museum. Gross Floor Area of 516m2 (C) Remodelling of hard and soft landscaping within โMuseum Close' between the Spanish Arch, and the existing Galway City Museum, together with local elements of hard landscaping in front of Comerford House and the Spanish Arch within the Fish Market. (D) Alterations to the existing Galway City Museum building include: new exit door from reception lobby, with new steps and Part M platform lift, new canopies and display windows, relocated ESB sub-station and enclosure.
Procedure Type of procedure
Restricted procedure โ Administrative information
Time limit for receipt of tenders or requests to participate: 2024-08-22 12:00:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Complementary information Review body
Name: The High Court of Ireland
National registration number: The High Court of Ireland
Postal address: Four Courts, Inns Quay, Dublin 7
Postal code: D07 WDX8
Postal town: Dublin
Country: Ireland ๐ฎ๐ช
E-mail: highcourtcentraloffice@courts.ie๐ง
Phone: +353 1 8886000๐ Information about electronic workflows
Electronic invoicing will be accepted
Source: OJS 2024/S 146-454382 (2024-07-26)