EirGrid and SONI have a requirement for an Energy Trading Partner. EirGrid and SONI, in their roles as Transmission System Operators (TSO) in the Republic of Ireland and Northern Ireland respectively, have an obligation to take various measures to minimise curtailment of priority dispatch generation (mainly renewables), including the use of countertrading on interconnectors. There may be at times security of supply obligations where interconnector flows need to be adjusted and/or testing. EirGrid and SONI wish to engage an Energy Trading Partner to facilitate counter-trading. The expected situations that will generate trade volume requests from the TSOs to the Energy Trading Partner are: Priority Dispatch Security of Supply Optimisation of the Large Single Infeed Testing of Interconnectors The Trading Partner will act to sell or buy electricity from the GB market following market gate closure on I-SEM. The applicable TSO will identify the volume of energy required to be counter-traded over each DC interconnector. The Trading Partner may be responsible for setting up the required market infrastructure (e.g. registration of units) and systems to allow such trades to occur. The Energy Trading Partner will be required to register (at their cost) Balancing Mechanism Units (BMUs) as detailed below. The EWIC BMUs should have a Generation Capacity and a Demand Capacity of 1030 MW (representing the full potential swing of the interconnector). The Greenlink BMUs should have a Generation Capacity and a Demand Capacity of 1034 MW (representing the full potential swing of the interconnector). The Moyle BMUs should have a Generation Capacity and a Demand Capacity of 1000 MW (representing the full potential swing of the interconnector).
Deadline
The time limit for receipt of tenders was 2024-10-31.
The procurement was published on 2024-10-01.
Contract notice (2024-10-01) Object Scope of the procurement
Title: ENQEIR915 Energy Trading Partner
Short description:
โEirGrid and SONI have a requirement for an Energy Trading Partner. EirGrid and SONI, in their roles as Transmission System Operators (TSO) in the Republic...โ
Short description
EirGrid and SONI have a requirement for an Energy Trading Partner. EirGrid and SONI, in their roles as Transmission System Operators (TSO) in the Republic of Ireland and Northern Ireland respectively, have an obligation to take various measures to minimise curtailment of priority dispatch generation (mainly renewables), including the use of countertrading on interconnectors. There may be at times security of supply obligations where interconnector flows need to be adjusted and/or testing. EirGrid and SONI wish to engage an Energy Trading Partner to facilitate counter-trading. The expected situations that will generate trade volume requests from the TSOs to the Energy Trading Partner are: Priority Dispatch Security of Supply Optimisation of the Large Single Infeed Testing of Interconnectors The Trading Partner will act to sell or buy electricity from the GB market following market gate closure on I-SEM. The applicable TSO will identify the volume of energy required to be counter-traded over each DC interconnector. The Trading Partner may be responsible for setting up the required market infrastructure (e.g. registration of units) and systems to allow such trades to occur. The Energy Trading Partner will be required to register (at their cost) Balancing Mechanism Units (BMUs) as detailed below. The EWIC BMUs should have a Generation Capacity and a Demand Capacity of 1030 MW (representing the full potential swing of the interconnector). The Greenlink BMUs should have a Generation Capacity and a Demand Capacity of 1034 MW (representing the full potential swing of the interconnector). The Moyle BMUs should have a Generation Capacity and a Demand Capacity of 1000 MW (representing the full potential swing of the interconnector).
Show more
Type of contract: Services
Products/services: Energy and related services๐ฆ
Estimated value excluding VAT: 12 000 000 EUR ๐ฐ
Information about lots
Tenders may be submitted for maximum number of lots: 0
Description
Description of the procurement:
โEirGrid and SONI have a requirement for an Energy Trading Partner. EirGrid and SONI, in their roles as Transmission System Operators (TSO) in the Republic...โ
Description of the procurement
EirGrid and SONI have a requirement for an Energy Trading Partner. EirGrid and SONI, in their roles as Transmission System Operators (TSO) in the Republic of Ireland and Northern Ireland respectively, have an obligation to take various measures to minimise curtailment of priority dispatch generation (mainly renewables), including the use of countertrading on interconnectors. There may be at times security of supply obligations where interconnector flows need to be adjusted and/or testing. EirGrid and SONI wish to engage an Energy Trading Partner to facilitate counter-trading. The expected situations that will generate trade volume requests from the TSOs to the Energy Trading Partner are: Priority Dispatch Security of Supply Optimisation of the Large Single Infeed Testing of Interconnectors The Trading Partner will act to sell or buy electricity from the GB market following market gate closure on I-SEM. The applicable TSO will identify the volume of energy required to be counter-traded over each DC interconnector. The Trading Partner may be responsible for setting up the required market infrastructure (e.g. registration of units) and systems to allow such trades to occur. The Energy Trading Partner will be required to register (at their cost) Balancing Mechanism Units (BMUs) as detailed below. The EWIC BMUs should have a Generation Capacity and a Demand Capacity of 1030 MW (representing the full potential swing of the interconnector). The Greenlink BMUs should have a Generation Capacity and a Demand Capacity of 1034 MW (representing the full potential swing of the interconnector). The Moyle BMUs should have a Generation Capacity and a Demand Capacity of 1000 MW (representing the full potential swing of the interconnector).
Show more Duration
Start date: 2024-02-28 ๐
End date: 2030-02-28 ๐
Information about options
Options โ
Description of options:
โ6 years is the Maximum length of the contract, 3 years with the option to extend annually for 3 years.โ Award criteria
Criterion:
โPlease refer to the PQQ document for further informationโ Title
Lot Identification Number: LOT-0001
Procedure Type of procedure
Negotiated procedure with prior call for competition โ Administrative information
Time limit for receipt of tenders or requests to participate: 2024-10-31 12:00:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Estimated date of dispatch of invitations to tender or to participate to selected candidates: 2024-11-22 ๐
Legal, economic, financial and technical information Technical and professional ability
List and brief description of selection criteria:
โPlease refer to the PQQ document for further informationโ Conditions for participation
Main financing conditions and payment arrangements and/or reference to the relevant provisions governing them:
โPlease refer to the PQQ document for further informationโ Conditions related to the contract
Contract performance conditions:
โThe Contract will be made available atโ
Complementary information Review body
Name: The High Court of Ireland
National registration number: The High Court of Ireland
Postal address: Four Courts, Inns Quay, Dublin 7
Postal code: D07 WDX8
Postal town: Dublin
Country: Ireland ๐ฎ๐ช
E-mail: highcourtcentraloffice@courts.ie๐ง
Phone: +353 1 8886000๐ Review procedure
Precise information on deadline(s) for review procedures:
โPlease refer to the PQQ document for further information.โ