Iร are seeking to install a Computer Based Interlocking (CBI) Cabinet that contains the interlocking logic which processes the route setting activity based on the dispatcher command, and the control of the trackside with the corresponding level of safety.
Object Controllers (OC) that monitor and control trackside objects are also required.
Lineside Electronic Units (LEU) may be required as a part of this tender.
This contract will run for circa 25 years
Deadline
The time limit for receipt of tenders was 2022-06-22.
The procurement was published on 2022-05-18.
Object Scope of the procurement
Title: LONG TERM SUPPLY AND SUPPORT OF A COMPUTER BASED INTERLOCKING SYSTEM
7863
Products/services: Electrical signalling equipment for railways๐ฆ
Short description:
โIร are seeking to install a Computer Based Interlocking (CBI) Cabinet that contains the interlocking logic which processes the route setting activity based...โ
Short description
Iร are seeking to install a Computer Based Interlocking (CBI) Cabinet that contains the interlocking logic which processes the route setting activity based on the dispatcher command, and the control of the trackside with the corresponding level of safety.
Object Controllers (OC) that monitor and control trackside objects are also required.
Lineside Electronic Units (LEU) may be required as a part of this tender.
This contract will run for circa 25 years
Show more
Estimated value excluding VAT: EUR 50 000 000 ๐ฐ
Iร are seeking to install a Computer Based Interlocking (CBI) Cabinet that contains the interlocking logic which processes the route setting activity based on the dispatcher command, and the control of the trackside with the corresponding level of safety.
Object Controllers (OC) that monitor and control trackside objects are also required.
Lineside Electronic Units (LEU) may be required as a part of this tender.
This contract will run for circa 25 years
Show more Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
Scope of the procurement
Estimated total value excluding VAT: EUR 50 000 000 ๐ฐ
Duration of the contract, framework agreement or dynamic purchasing system
The time frame below is expressed in number of months.
Description
Duration: 300
Legal, economic, financial and technical information Conditions for participation
List and brief description of conditions:
โFor full details, please download a copy of the attached Pre-Qualification Questionnaire.โ Economic and financial standing
List and brief description of selection criteria:
โThe economic and financial capacity of the entity must be established to the satisfaction of IE.
Applicants will be invited to complete a questionnaire...โ
List and brief description of selection criteria
The economic and financial capacity of the entity must be established to the satisfaction of IE.
Applicants will be invited to complete a questionnaire (attached) which seeks company details; information on similar contracts undertaken with value, dates, locations and contact names for reference etc; applicants may be requested to provide supporting information such as balance sheets for the past three financial years.
For full details, please download a copy of the attached Pre-Qualification Questionnaire.
Show more Technical and professional ability
List and brief description of selection criteria:
โThe technical competence of the entity, its employees and processes must be established to the satisfaction of IE. Applicants will be invited to complete a...โ
List and brief description of selection criteria
The technical competence of the entity, its employees and processes must be established to the satisfaction of IE. Applicants will be invited to complete a questionnaire which seeks company details to establish the entityโs technical capacity.
For full details, please download a copy of the attached Pre-Qualification Questionnaire.
Show more Conditions related to the contract
Contract performance conditions:
โFor full details, please download a copy of the attached Pre-Qualification Questionnaire.โ
Procedure Type of procedure
Negotiated procedure with prior call for competition
Information about a framework agreement or a dynamic purchasing system
Framework agreement with a single operator
Description
In the case of framework agreements, provide justification for any duration exceeding 8 years:
โThe majority of Iรโs signalling network is controlled by Route Relay Interlocking system and SSI ,distributed nationally. These interlockingโs with...โ
In the case of framework agreements, provide justification for any duration exceeding 8 years
The majority of Iรโs signalling network is controlled by Route Relay Interlocking system and SSI ,distributed nationally. These interlockingโs with exception of one, are of the 1980โs vintage. A 25+ year Framework agreement will ensure that IE will deliver a uniform and consistent system across the network during the mitigation ( upgrade / replacement) from the obsolete systems .
Show more Administrative information
Time limit for receipt of tenders or requests to participate: 2022-06-22
12:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Complementary information Review body
Name: Central Office of the High Court
Postal address: Four Courts
Postal town: Dublin 7
Postal code: D07 N972
Country: Ireland ๐ฎ๐ช
Phone: +353 18886511๐
E-mail: highcourtcentraloffice@courts.ie๐ง
Fax: +353 18886125 ๐
URL: http://www.courts.ie๐ Service from which information about the review procedure may be obtained
Name: Central Office of the High Court
Postal address: Four Courts
Postal town: Dublin 7
Postal code: D07 N972
Country: Ireland ๐ฎ๐ช
Phone: +353 18886511๐
E-mail: highcourtcentraloffice@courts.ie๐ง
Fax: +353 18886125 ๐
URL: http://www.courts.ie๐
Source: OJS 2022/S 099-275322 (2022-05-18)
Additional information (2022-06-03)
Complementary information Original notice reference
Notice number in the OJ S: 2022/S 099-275322
Changes Text to be corrected in the original notice
Section number: IV.2.2
Place of text to be modified: Time limit for receipt of tenders or request to participate
Old value
Date: 2022-06-22 ๐
Time: 12:00
New value
Date: 2022-07-06 ๐
Time: 12:00
Source: OJS 2022/S 109-309320 (2022-06-03)
Additional information (2022-11-10)
Changes Text to be corrected in the original notice
Section number: II.1.4
Place of text to be modified: Short description
Old value
Text: This contract will run for circa 25 years
New value
Text:
โThe procurement involves the award of a Long Term Supply Contract and a Long Term Maintenance Support Services Contract.
A Long Term Supply Contract for the...โ
Text
The procurement involves the award of a Long Term Supply Contract and a Long Term Maintenance Support Services Contract.
A Long Term Supply Contract for the CBI equipment for an initial 10-year term with options to extend for a further 10 years and again for a further 5 years, up to a maximum of 25 years and a Long Term Maintenance Support Services Contract for an initial 10-year term with options to extend for a further 10 years and again for a further 5 years, up to a maximum of 25 years.
Show more Text to be corrected in the original notice
Section number: II.2.4
Place of text to be modified: Description of the procurement
Old value
Text: This contract will run for circa 25 years
New value
Text:
โThe procurement involves the award of a Long Term Supply Contract and a Long Term Maintenance Support Services Contract.
A Long Term Supply Contract for the...โ
Text
The procurement involves the award of a Long Term Supply Contract and a Long Term Maintenance Support Services Contract.
A Long Term Supply Contract for the CBI equipment for an initial 10-year term with options to extend for a further 10 years and again for a further 5 years, up to a maximum of 25 years and a Long Term Maintenance Support Services Contract for an initial 10-year term with options to extend for a further 10 years and again for a further 5 years, up to a maximum of 25 years.
Show more Text to be corrected in the original notice
Section number: IV.1.3
Place of text to be modified: Information about a framework agreement or a dynamic purchasing system
Old value
Text:
โFramework agreement with a single operator
In the case of framework agreements, provide justification for any duration exceeding 8 years:
The majority of...โ
Text
Framework agreement with a single operator
In the case of framework agreements, provide justification for any duration exceeding 8 years:
The majority of Iรโs signalling network is controlled by Route Relay Interlocking system and SSI
,distributed nationally. These interlockingโs with exception of one, are of the 1980โs vintage. A 25+
year Framework agreement will ensure that IE will deliver a uniform and consistent system across
the network during the mitigation ( upgrade / replacement) from the obsolete systems .
Show more New value
Text:
โThis is not a framework agreement so original text is to be deleted
The procurement involves the award of a Long Term Supply Contract and a Long Term...โ
Text
This is not a framework agreement so original text is to be deleted
The procurement involves the award of a Long Term Supply Contract and a Long Term Maintenance Support Services Contract.
A Long Term Supply Contract for the CBI equipment for an initial 10-year term with options to extend for a further 10 years and again for a further 5 years, up to a maximum of 25 years and a Long Term Maintenance Support Services Contract for an initial 10-year term with options to extend for a further 10 years and again for a further 5 years, up to a maximum of 25 years.
Show more
Source: OJS 2022/S 220-632260 (2022-11-10)