The Garrai Beag Social Housing Scheme Works are for the completion of approximately 80% of the total construction works to provide 58 no. social housing units and associated siteworks on a site in Ballybaan More on behalf of Galway City Council.. The development is for a total of 58 no. social housing units, consisting of 40 no. 2-storey houses and 18 no. apartment/duplex units located in 3-storey corner buildings. The development has a mix of 1-, 2-, 3- and 4-bedroom units and each has its own door access and individual private open space. Approximately 20% of the total construction works for the development was carried out by a previous contractor between June 2020 and June 2022. The works already carried out on the site include some partially complete structures and partially complete siteworks including drainage installations.
Deadline
The time limit for receipt of tenders was 2022-10-10.
The procurement was published on 2022-09-06.
Suppliers
The following suppliers are mentioned in award decisions or other procurement documents:
Object Scope of the procurement
Title:
โConstruction of houses at Garrai Beag Social Housing Scheme, 58 Units, Ballybaan More, Galwayโ
Products/services: Houses construction work๐ฆ
Short description:
โThe Garrai Beag Social Housing Scheme Works are for the completion of approximately 80% of the total construction works to provide 58 no. social housing...โ
Short description
The Garrai Beag Social Housing Scheme Works are for the completion of approximately 80% of the total construction works to provide 58 no. social housing units and associated siteworks on a site in Ballybaan More on behalf of Galway City Council.. The development is for a total of 58 no. social housing units, consisting of 40 no. 2-storey houses and 18 no. apartment/duplex units located in 3-storey corner buildings. The development has a mix of 1-, 2-, 3- and 4-bedroom units and each has its own door access and individual private open space. Approximately 20% of the total construction works for the development was carried out by a previous contractor between June 2020 and June 2022. The works already carried out on the site include some partially complete structures and partially complete siteworks including drainage installations.
Show more
Estimated value excluding VAT: EUR 10 000 000 ๐ฐ
The Garrai Beag Social Housing Scheme Works are for the completion of approximately 80% of the total construction works to provide 58 no. social housing units and associated siteworks on a site in Ballybaan More on behalf of Galway City Council. The site measures 1.97 hectares and is located in a residential area in the established suburb of Ballybaan in the east of Galway City. The site is defined by the Monivea Road and Old Ballybaan Road/Rocklands Avenue to the north and west and by Castle Park recreational lands to the south and east. The development is for a total of 58 no. social housing units, consisting of 40 no. 2-storey houses and 18 no. apartment/duplex units located in 3-storey corner buildings. The development has a mix of 1-, 2-, 3- and 4-bedroom units and each has its own door access and individual private open space. The construction is traditional masonry cavity walls with brick and render finish on raft slab foundations with a mix of pitched slate roofs and mono-pitched PVC membrane roofs.
Approximately 20% of the total construction works for the development was carried out by a previous contractor between June 2020 and June 2022. The works already carried out on the site include some partially complete structures and partially complete siteworks including drainage installations.
The Works include the completion of all structures for all 58 no. units including the construction of raft slabs; brickwork and blockwork masonry cavity walls; roofs, external terraces, rainwater systems, PV systems and external finishes and decoration. The Works include the supply and installation of all windows and external doors throughout and the construction of all internal works including all ground floor insulation and screed, all M&E works, all internal partitions, ceilings, doors, fire stopping, bathroom fittings and kitchen fit-out and all finishes and decoration throughout.
Show more Award criteria
Quality criterion (name): Quality
Quality criterion (weighting): 100
Price (weighting): 0
Scope of the procurement
Estimated total value excluding VAT: EUR 10 000 000 ๐ฐ
Duration of the contract, framework agreement or dynamic purchasing system
The time frame below is expressed in number of months.
Description
Duration: 15
Procedure Type of procedure
Restricted procedure
Administrative information
Time limit for receipt of tenders or requests to participate: 2022-10-10
12:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Complementary information Review body
Name: Galway City Council
Postal address: City Hall, College Road
Postal town: Galway
Country: Ireland ๐ฎ๐ช
Source: OJS 2022/S 174-489108 (2022-09-06)
Contract award notice (2023-08-22) Object Scope of the procurement
Total value of the procurement (excluding VAT): EUR 14 149 293 ๐ฐ
Description
Main site or place of performance: Galway
Award criteria
Quality criterion (weighting): 20
Price (weighting): 80
Procedure Administrative information
Previous publication concerning this procedure: 2022/S 174-489108
Award of contract
1๏ธโฃ
Contract Number: 1
Title:
โConstruction of houses at Garrai Beag Social Housing Scheme, 58 Units, Ballybaan More, Galwayโ
Date of conclusion of the contract: 2023-07-19 ๐
Information about tenders
Number of tenders received: 2
Name and address of the contractor
Name: J.J. Rhatigan & Company Unlimited Company
National registration number: 133463
Postal address: Wolfe Tone House, Fr. Griffin Road
Postal town: Galway
Postal code: H91PW72
Country: Ireland ๐ฎ๐ช
Region: West๐๏ธ
The contractor is an SME
Information on value of the contract/lot (excluding VAT)
Total value of the contract/lot: EUR 14 149 293 ๐ฐ