This project scope includes for design, manufacture with factory acceptance test (FAT), transport and installation of one 3 tunnel Passenger Boarding Bridge (hereafter referred to as a PBB) on site at the Pier Building in Shannon Airport. The new PBB supply will cover all major components including the rotunda support column, rotunda including the connection corridor to the Pier Building, tunnel sections, bridgehead, service stairs, vertical drive and wheel drive unit and all other equipment detailed in this specification. The PBB supplier will be responsible for all on-site works.
Deadline
The time limit for receipt of tenders was 2021-03-24.
The procurement was published on 2021-02-16.
Suppliers
The following suppliers are mentioned in award decisions or other procurement documents:
Object Scope of the procurement
Title:
โSupply of a Passenger Boarding Bridge Installation to Shannon Airport Authority DACโ
Products/services: Passenger boarding bridges for aircraft๐ฆ
Short description:
โThis project scope includes for design, manufacture with factory acceptance test (FAT), transport and installation of one 3 tunnel Passenger Boarding Bridge...โ
Short description
This project scope includes for design, manufacture with factory acceptance test (FAT), transport and installation of one 3 tunnel Passenger Boarding Bridge (hereafter referred to as a PBB) on site at the Pier Building in Shannon Airport. The new PBB supply will cover all major components including the rotunda support column, rotunda including the connection corridor to the Pier Building, tunnel sections, bridgehead, service stairs, vertical drive and wheel drive unit and all other equipment detailed in this specification. The PBB supplier will be responsible for all on-site works.
Show more
Estimated value excluding VAT: EUR 600 000 ๐ฐ
This project scope includes for design, manufacture with factory acceptance test (FAT), transport and installation of one 3 tunnel Passenger Boarding Bridge (hereafter referred to as a PBB) on site at the Pier Building in Shannon Airport. The new PBB supply will cover all major components including the rotunda support column, rotunda including the connection corridor to the Pier Building, tunnel sections, bridgehead, service stairs, vertical drive and wheel drive unit and all other equipment detailed in this specification. The PBB supplier will be responsible for all on-site works.
Show more Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
Scope of the procurement
Estimated total value excluding VAT: EUR 600 000 ๐ฐ
Duration of the contract, framework agreement or dynamic purchasing system
The time frame below is expressed in number of months.
Description
Duration: 9
Legal, economic, financial and technical information Economic and financial standing
Selection criteria as stated in the procurement documents
Technical and professional ability
Selection criteria as stated in the procurement documents
Information about staff responsible for the performance of the contract
Obligation to indicate the names and professional qualifications of the staff assigned to performing the contract
Procedure Type of procedure
Open procedure
Administrative information
Time limit for receipt of tenders or requests to participate: 2021-03-24
15:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
The time frame below is expressed in number of months.
Minimum time frame during which the tenderer must maintain the tender: 4
Conditions for opening of tenders: 2021-03-24
15:00 ๐
Complementary information Review body
Name: Office of Government Procurement
Postal town: Dublin
Country: Ireland ๐ฎ๐ช
Source: OJS 2021/S 035-088305 (2021-02-16)
Additional information (2021-03-19) Contracting authority Name and addresses
Postal address: Shannon Airport, Shannon
Object Scope of the procurement
Short description:
โThis project scope includes for design, manufacture with Factory Acceptance Test (FAT), transport and installation of one 3 tunnel passenger boarding bridge...โ
Short description
This project scope includes for design, manufacture with Factory Acceptance Test (FAT), transport and installation of one 3 tunnel passenger boarding bridge (hereafter referred to as a PBB) on site at the Pier Building in Shannon Airport. The new PBB supply will cover all major components including the rotunda support column, rotunda including the connection corridor to the Pier Building, tunnel sections, bridgehead, service stairs, vertical drive and wheel drive unit and all other equipment detailed in this specification. The PBB supplier will be responsible for all on-site works.
Complementary information Original notice reference
Notice number in the OJ S: 2021/S 035-088305
Changes Text to be corrected in the original notice
Section number: IV.2.2)
Place of text to be modified: Time limit for receipt of tenders or requests to participate
Old value
Date: 2021-03-24 ๐
Time: 15:00
New value
Date: 2021-03-29 ๐
Time: 15:00
Source: OJS 2021/S 058-147734 (2021-03-19)
Contract award notice (2021-08-18) Contracting authority Name and addresses
Postal code: Co.
Object Scope of the procurement
Short description:
โThis project scope includes for design, manufacture with factory acceptance test (FAT), transport and installation of one 3 tunnel Passenger Boarding Bridge...โ
Short description
This project scope includes for design, manufacture with factory acceptance test (FAT), transport and installation of one 3 tunnel Passenger Boarding Bridge (hereafter referred to as a PBB) on site at the Pier Building in Shannon Airport. The new PBB supply will cover all major components including the rotunda support column, rotunda including the connection corridor to the Pier Building, tunnel sections, bridgehead, service stairs, vertical drive and wheel drive unit and all other equipment detailed in this specification. The PBB supplier will be responsible for all on-site works
Show more Description
Description of the procurement:
โThis project scope includes for design, manufacture with factory acceptance test (FAT), transport and installation of one 3 tunnel Passenger Boarding Bridge...โ
Description of the procurement
This project scope includes for design, manufacture with factory acceptance test (FAT), transport and installation of one 3 tunnel Passenger Boarding Bridge (hereafter referred to as a PBB) on site at the Pier Building in Shannon Airport. The new PBB supply will cover all major components including the rotunda support column, rotunda including the connection corridor to the Pier Building, tunnel sections, bridgehead, service stairs, vertical drive and wheel drive unit and all other equipment detailed in this specification. The PBB supplier will be responsible for all on-site works
Show more Award criteria
Quality criterion (name): Team
Quality criterion (weighting): 12.5%
Quality criterion (name): Timeline
Quality criterion (name): Other
Quality criterion (weighting): 15%
Price (weighting): 60%
Procedure Administrative information
Previous publication concerning this procedure: 2021/S 035-088305
Award of contract
1๏ธโฃ
Contract Number: 1
Title:
โSupply of a Passenger Boarding Bridge Installation to Shannon Airport Authority DACโ
Date of conclusion of the contract: 2021-08-05 ๐
Information about tenders
Number of tenders received: 5
Number of tenders received from SMEs: 0
Number of tenders received from tenderers from other EU Member States: 4
Number of tenders received from tenderers from non-EU Member States: 1
Number of tenders received by electronic means: 5
Name and address of the contractor
Name: Shenzhen cimc-tianda airport support ltd
National registration number: 9144030061880852XW
Postal address: NO.9 FUYUAN 2ND ROAD, FUHAI STREEET,BAOAN DISTRICT
Postal town: Shenzhen
Postal code: 518103
Country: China ๐จ๐ณ
Phone: +86 75526688488๐
E-mail: xiao.xia@stas.cimc.com๐ง
Region: cn ๐๏ธ
URL: http://www.cimc-tianda.com/en/rcfz/index.aspx๐
The contractor is an SME
Source: OJS 2021/S 162-427729 (2021-08-18)