The building comprises 4 stories over basement georgian building (a protected structure) fronting onto Stephenโs Green East and a 1970โs building โ 2/5 stories over basement, facing onto Ely Place Upper with a link to 50 and 51 St Stephen's Green.
The 1970โs building requires a substantial range of upgrading works to the building fabric. The Georgian building is in good decorative order retaining many of its original features including fine decorative ceilings and main staircase. The total Gross Floor Area of the buildings on the site is 5 226 m.
The development will consist of the complete strip out and renovation and refurbishment/deep retrofit of the 1970's building (c. 3 678 m GIA), and some conservation and upgrading works to the Georgian Building (c. 1 548 m GIA including 1990โs link) along with some external works.
Deadline
The time limit for receipt of tenders was 2021-02-22.
The procurement was published on 2021-01-15.
Object Scope of the procurement
Title:
โMain Contract for the Deep Retrofit Refurbishment of 52 St Stephen's Green, Dublin 2
SSG2020-MCโ
Products/services: Building construction work๐ฆ
Short description:
โThe building comprises 4 stories over basement georgian building (a protected structure) fronting onto Stephenโs Green East and a 1970โs building โ 2/5...โ
Short description
The building comprises 4 stories over basement georgian building (a protected structure) fronting onto Stephenโs Green East and a 1970โs building โ 2/5 stories over basement, facing onto Ely Place Upper with a link to 50 and 51 St Stephen's Green.
The 1970โs building requires a substantial range of upgrading works to the building fabric. The Georgian building is in good decorative order retaining many of its original features including fine decorative ceilings and main staircase. The total Gross Floor Area of the buildings on the site is 5 226 m.
The development will consist of the complete strip out and renovation and refurbishment/deep retrofit of the 1970's building (c. 3 678 m GIA), and some conservation and upgrading works to the Georgian Building (c. 1 548 m GIA including 1990โs link) along with some external works.
1๏ธโฃ
Additional products/services: Buildings of particular historical or architectural interest๐ฆ
Additional products/services: Building alteration work๐ฆ
Place of performance: Dublin๐๏ธ
Main site or place of performance: Dublin, D02 DR67.
Description of the procurement:
โThe building comprises 4 stories over basement Georgian building (a Protected Structure) fronting onto Stephenโs Green East and a 1970โs building โ 2/5...โ
Description of the procurement
The building comprises 4 stories over basement Georgian building (a Protected Structure) fronting onto Stephenโs Green East and a 1970โs building โ 2/5 stories over basement, facing onto Ely Place Upper with a link to 50 and 51 St Stephen's Green.
The 1970โs building requires a substantial range of upgrading works to the building fabric. The Georgian building is in good decorative order retaining many of its original features including fine decorative ceilings and main staircase. The total Gross Floor Area of the buildings on the site is 5 226 m.
The development will consist of the complete strip out and renovation and refurbishment/deep retrofit of the 1970's building (c. 3 678 m GIA), and some conservation and upgrading works to the Georgian Building (c. 1 548 m GIA including 1990โs link). The complete strip-out and replacement of all M&E services; The complete strip-out and replacement of the architectural fabric of all non-historic built elements, to include replacement of all existing glazing (with exception of historic sash windows) with high performing glazing systems. Insulation and new finishes will also be required to existing external walls, floors, roofs and basement soffit of modern parts of the building. All in accordance with the building regulations and in compliance with Energy Performance of Buildings Directive (NZEB) requirements, to achieve minimum A2 rating; refurbishment of existing bicycle shed in 51 St Stephenโs Green and provision of adjoining dedicated shower and locker rooms; external hard landscaping works to include conservation of existing external steps, paving, lighting and railings to front of 52 St Stephenโs Green; upgrading of hard landscaping to rear, including gates, railings, paving, lighting and any steps or ramps required to facilitate universal access to rear entrance; and upgrading of external areas.
Show more Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
Duration of the contract, framework agreement or dynamic purchasing system
The time frame below is expressed in number of months.
Description
Duration: 18
Information about the limits on the number of candidates to be invited
Envisaged minimum number: 5
Maximum number: 8
Objective criteria for choosing the limited number of candidates: As stated in the procurement documents.
Description
Additional information:
โPlease read all tender documentation and closely follow the instructions contained therein.โ
Legal, economic, financial and technical information Economic and financial standing
Selection criteria as stated in the procurement documents
Technical and professional ability
Selection criteria as stated in the procurement documents
Information about staff responsible for the performance of the contract
Obligation to indicate the names and professional qualifications of the staff assigned to performing the contract
Procedure Type of procedure
Restricted procedure
Administrative information
Time limit for receipt of tenders or requests to participate: 2021-02-22
12:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Complementary information Review body
Name: The Commissioners of Public Works in Ireland
Postal address: 52 St Stephen's Green
Postal town: Dublin
Postal code: D02 DR67
Country: Ireland ๐ฎ๐ช
Phone: +353 16476000๐
E-mail: refurb52ssg@opw.ie๐ง
URL: http://www.opw.ie/๐
Source: OJS 2021/S 013-026635 (2021-01-15)