Demolition of Existing Spectator Stand, Construction of New Spectator Stand, Entrance Plaza and associated works at St Conleth's GAA Park, Newbridge, Co. Kildare
The project proposes the demolition of the existing covered terrace stand along the western side-line of the existing pitch at St Conleth’s Park and the construction of a new 2 storey, 1 840 m, 2 663 seated covered stand to include at ground floor level - player and officials’ welfare and changing facilities, administration offices, public toilets, plant room and refreshment kiosks and at 1 floor level – a premium multi-purpose area consisting of meeting, conference, training and leisure facilities with toilets and modest kitchen facilities.
It includes the demolition of the existing clubhouse and changing rooms together with modifications to the entrance gates and boundary to create a new entrance plaza with a tickets sales area and turnstiles.
Modification to external hard and soft landscaping, and alteration to existing boundary treatment.
Deadline
The time limit for receipt of tenders was 2021-04-23.
The procurement was published on 2021-03-16.
Object Scope of the procurement
Title:
“Demolition of Existing Spectator Stand, Construction of New Spectator Stand, Entrance Plaza and associated works at St Conleth's GAA Park, Newbridge, Co....”
Title
Demolition of Existing Spectator Stand, Construction of New Spectator Stand, Entrance Plaza and associated works at St Conleth's GAA Park, Newbridge, Co. Kildare
CLGKDEVSCP01
Show more
Products/services: Construction work📦
Short description:
“The project proposes the demolition of the existing covered terrace stand along the western side-line of the existing pitch at St Conleth’s Park and the...”
Short description
The project proposes the demolition of the existing covered terrace stand along the western side-line of the existing pitch at St Conleth’s Park and the construction of a new 2 storey, 1 840 m, 2 663 seated covered stand to include at ground floor level - player and officials’ welfare and changing facilities, administration offices, public toilets, plant room and refreshment kiosks and at 1 floor level – a premium multi-purpose area consisting of meeting, conference, training and leisure facilities with toilets and modest kitchen facilities.
It includes the demolition of the existing clubhouse and changing rooms together with modifications to the entrance gates and boundary to create a new entrance plaza with a tickets sales area and turnstiles.
Modification to external hard and soft landscaping, and alteration to existing boundary treatment.
Show more
Estimated value excluding VAT: EUR 7 500 000 💰
The project proposes the demolition of the existing covered terrace stand along the western side-line of the existing pitch at St Conleth’s Park and the construction of a new 2 storey, 1 840 m, 2 663 seated covered stand to include:
• at ground floor level — player and officials’ welfare and changing facilities, administration offices, public toilets, plant room and refreshment kiosks; and
• at 1 floor level – a premium multi-purpose area consisting of meeting, conference, training and leisure facilities with toilets and modest kitchen facilities.
It includes the demolition of the existing clubhouse and changing rooms together with modifications to the entrance gates and boundary to create a new entrance plaza with a tickets sales area and turnstiles.
Modification to external hard and soft landscaping, and alteration to existing boundary treatment/external signage and the provision for the re-instatement of pedestrian access at the existing stone archway on Athgarvan Road.
Show more Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
Scope of the procurement
Estimated total value excluding VAT: EUR 7 500 000 💰
Duration of the contract, framework agreement or dynamic purchasing system
The time frame below is expressed in number of months.
Description
Duration: 24
Information about the limits on the number of candidates to be invited
Envisaged number of candidates: 6
Objective criteria for choosing the limited number of candidates: Refer to suitability assessment questionnaire and project information document.
Legal, economic, financial and technical information Economic and financial standing
Selection criteria as stated in the procurement documents
Technical and professional ability
Selection criteria as stated in the procurement documents
Procedure Type of procedure
Restricted procedure
Administrative information
Time limit for receipt of tenders or requests to participate: 2021-04-23
12:00 📅
Estimated date of dispatch of invitations to tender or to participate to selected candidates: 2021-05-24 📅
Languages in which tenders or requests to participate may be submitted: English 🗣️
The time frame below is expressed in number of months.
Minimum time frame during which the tenderer must maintain the tender: 6
Complementary information Information about electronic workflows
Electronic ordering will be used
Electronic invoicing will be accepted
Electronic payment will be used
Additional information
“1)Interested parties must register their interest on the eTenders web site (www.etenders.gov.ie) in order to be included on the mailing list for...”
1)Interested parties must register their interest on the eTenders web site (www.etenders.gov.ie) in order to be included on the mailing list for clarifications. All information relating to attachments, including clarifications and changes, will be published on the Irish Government Procurement Opportunities Portal (www.etenders.gov.ie) only. Registration is free of charge. The contracting authority will not accept responsibility for information relayed (or not relayed) via third parties;
2) Suppliers must register their interest on the eTenders web site (www.etenders.gov.ie) in order to be included on the mailing list for clarifications and to respond electronically to the competition. There is a maximum upload limit of 2GB per document on etenders. Documents larger than this should be divided into smaller files prior to upload or zipped. Should you experience difficulty when uploading documents please contact the eTenders Support Desk for technical assistance;
3) All queries regarding this tender requirement or process must be submitted through the Irish Government Procurement Opportunities Portal www.etenders.gov.ie) as a specific question. Responses will be circulated to those tenderers that have registered an interest in this notice on www.etenders.gov.ie The details of the person making a query will not be disclosed when circulating the response;
4) The contracting authority will not be responsible for any costs, charges or expenses incurred by candidates or tenderers;
5) Please note in relation to all documents, that where reference is made to a particular standard, make, source, process, trademark, type or patent, that this is not to be regarded as a de facto requirement. In all such cases it should be understood that such indications are to be treated strictly and solely for reference purposes only, to which the words ‘or equivalent’ will always be appended;
6) Without prejudice to the principle of equal treatment, the contracting authority is not obliged to engage in a clarification process in respect of the procurement documents with missing or incomplete information. Therefore, respondents are advised to ensure that they return completed documentation in order to avoid the risk of elimination from the competition;
7)The contracting authority will not be responsible for any costs, charges or expenses incurred by candidates or tenderers relating to this contract award procedure irrespective of the outcome of the competition, or if the competition is postponed or cancelled. All costs incurred by interested parties in participating in this competition must be borne by them.
8) Any contract award will be subject to a number of preconditions, including production of a current tax clearance certificate or tax clearance statement from the Revenue Commissioners in Ireland;
9) The contracting authority may terminate this competition (or any part thereof), change the basis of and the procedures for the bidding process, at any time, or procure the project by alternative means if it appears that the project can thereby be more advantageously procured.
The most economically advantageous or any tender will not automatically be accepted.
Refer to procurement documents for further information.
Show more Review body
Name: The High Court of Ireland
Postal address: Four Courts, Inns Quay
Postal town: Dublin 7
Country: Ireland 🇮🇪
URL: http://www.courts.ie🌏
Source: OJS 2021/S 055-135410 (2021-03-16)