The works will entail the removal of the existing flat concrete tiled roof covering to include battens and roofing felt and disposal of same. The instillation of a new slated roof covering of circa 675 m on battens and counter battens on breathable felt underlay onto existing duo pitch roof truss @ 600 mm c/c, 30ยบ roof pitch.
Works will also entail new fascia, soffit, guttering, eaves and ridge ventilation, remedial works to chimney of boiler house, velux bulkheads and damaged ceilings internally in the building. Installation of new attic insulation and painting/decoration of internal classroom ceiling and walls.
Deadline
The time limit for receipt of tenders was 2020-06-25.
The procurement was published on 2020-06-18.
Contract notice (2020-06-18) Object Scope of the procurement
Title: Construction work
Reference number: Carrowkennedy National School
Short description:
โThe works will entail the removal of the existing flat concrete tiled roof covering to include battens and roofing felt and disposal of same. The...โ
Short description
The works will entail the removal of the existing flat concrete tiled roof covering to include battens and roofing felt and disposal of same. The instillation of a new slated roof covering of circa 675 m
Show more Notice metadata
Original language: English ๐ฃ๏ธ
Document type: Contract notice
Nature of contract: Works
Regulation: European Union
Common procurement vocabulary (CPV)
Code: Construction work๐ฆ
Additional CPV: Building completion work๐ฆ Place of performance
NUTS region: รire/Ireland๐๏ธ
Procedure
Procedure type: Open procedure
Type of bid: Submission for all lots
Award criteria
The most economic tender
โThe contract will not necessary be awarded on the basis of the lowest price as time frame to carry out the work will also be taken into account as well as...โ
The contract will not necessary be awarded on the basis of the lowest price as time frame to carry out the work will also be taken into account as well as the capacity of the contractor to carry out the works within the timeframe.
Show more
Source: OJS 2020/S 119-288166 (2020-06-18)