The construction of a new park: the works are to be undertaken on behalf of SDCC and include the construction of a public park. It includes significant earth work, drainage works, hard and soft landscape works, sport facilities, a building with changing facilities and cafe and specialised works (via a novated specialist) for playgrounds. It is also a requirement to realign the existing Tober stream so that it runs along the western boundary of the park. Some small pedestrian bridges are also required to be constructed over the stream.
The earth works include several cuts and fills along the site and earth shaping and moulding in order to meet the design levels on the footpaths, the pitch and the slopes as designed.
Landscape works include earth shaping, some retaining elements, fine cultivation, seeding with grass and wildflower seeds, planting of shrubs, trees, perennials and wetland areas.
Deadline
The time limit for receipt of tenders was 2019-09-05.
The procurement was published on 2019-08-06.
Object Scope of the procurement
Title: The Construction of Airlie Park, Adamstown
2471
Products/services: Engineering works and construction works๐ฆ
Short description:
โThe construction of a new park: the works are to be undertaken on behalf of SDCC and include the construction of a public park. It includes significant...โ
Short description
The construction of a new park: the works are to be undertaken on behalf of SDCC and include the construction of a public park. It includes significant earth work, drainage works, hard and soft landscape works, sport facilities, a building with changing facilities and cafe and specialised works (via a novated specialist) for playgrounds. It is also a requirement to realign the existing Tober stream so that it runs along the western boundary of the park. Some small pedestrian bridges are also required to be constructed over the stream.
The earth works include several cuts and fills along the site and earth shaping and moulding in order to meet the design levels on the footpaths, the pitch and the slopes as designed.
Landscape works include earth shaping, some retaining elements, fine cultivation, seeding with grass and wildflower seeds, planting of shrubs, trees, perennials and wetland areas.
Show more
Estimated value excluding VAT: EUR 10 000 000 ๐ฐ
1๏ธโฃ
Additional products/services: Engineering works and construction works๐ฆ
Place of performance: Dublin๐๏ธ
Main site or place of performance: Adamstown.
Description of the procurement:
โThe construction of a new park: Airlie Park in Adamstown. The proposed park is located within Tandy's Lane Helens Development Area within Adamstown SDZ...โ
Description of the procurement
The construction of a new park: Airlie Park in Adamstown. The proposed park is located within Tandy's Lane Helens Development Area within Adamstown SDZ Planning Scheme Area.
The works are to be undertaken on behalf of South Dublin County Council and include the construction of a public park of approximately 10.95 hectares. It includes significant earth work, drainage works, hard and soft landscape works, sport facilities, a building with changing facilities and cafe and specialised works (via a novated specialist) for playgrounds. It is also a requirement to realign the existing Tober stream so that it runs along the western boundary of the park. Some small pedestrian bridges are also required to be constructed over the stream.
The earth works include several cuts and fills along the site and earth shaping and moulding in order to meet the design levels on the footpaths, the pitch and the slopes as designed.
Landscape works include earth shaping, some retaining elements, fine cultivation, seeding with grass and wildflower seeds, planting of shrubs, trees, perennials and wetland areas. Hard landscape works include paving, walling and fencing, supply and installation of site furniture and signage.
Sport facilities comprise a full-size GAA all-weather pitch, a full size cricket ground, cricket practice areas, tennis courts and one storey building with changing facilities, equipment storage and a coffee dock.
Show more Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
Scope of the procurement
Estimated total value excluding VAT: EUR 10 000 000 ๐ฐ
Duration of the contract, framework agreement or dynamic purchasing system
The time frame below is expressed in number of months.
Description
Duration: 12
Information about the limits on the number of candidates to be invited
Envisaged number of candidates: 6
Description
Additional information:
โSubmissions must be submitted online via the electronic postbox on www.etenders.gov.ie before 04.00 p.m. on the 5.9.2019.โ
Procedure Type of procedure
Restricted procedure
Administrative information
Time limit for receipt of tenders or requests to participate: 2019-09-05
16:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Complementary information Review body
Name: The Chief Registrar
Postal address: High Court, The Four Courts
Postal town: Dublin
Postal code: 7
Country: Ireland ๐ฎ๐ช
Phone: +353 18886000๐
E-mail: highcourtcentraloffice@courts.ie๐ง Review procedure
Precise information on deadline(s) for review procedures:
โIn accordance with the European Communities (Public Authorities' Contracts) (Review Procedures) Regulations 2010 and the European Communities (Public...โ
Precise information on deadline(s) for review procedures
In accordance with the European Communities (Public Authorities' Contracts) (Review Procedures) Regulations 2010 and the European Communities (Public Authorities' Contracts) (Review Procedures) (Amendment) Regulations 2015.
Show more Service from which information about the review procedure may be obtained
Name: The Chief Registrar
Postal address: High Court, The Four Courts
Postal town: Dublin
Postal code: 7
Country: Ireland ๐ฎ๐ช
Phone: +353 18886000๐
E-mail: highcourtcentraloffice@courts.ie๐ง
Source: OJS 2019/S 152-374114 (2019-08-06)
Additional information (2019-09-03) Contracting authority Name and addresses
Postal address: County Hall, Dublin 24
Object Scope of the procurement
Short description:
โThe construction of a new park: The works are to be undertaken on behalf of SDCC and include the construction of a public park. It includes significant...โ
Short description
The construction of a new park: The works are to be undertaken on behalf of SDCC and include the construction of a public park. It includes significant earth work, drainage works, hard and soft landscape works, sport facilities, a building with changing facilities and cafe and specialised works (via a novated specialist) for playgrounds. It is also a requirement to realign the existing Tober stream so that it runs along the western boundary of the park. Some small pedestrian bridges are also required to be constructed over the stream.
The earth works include several cuts and fills along the site and earth shaping and moulding in order to meet the design levels on the footpaths, the pitch and the slopes as designed.
Landscape works include earth shaping, some retaining elements, fine cultivation, seeding with grass and wildflower seeds, planting of shrubs, trees, perennials and wetland areas.
Complementary information Original notice reference
Notice number in the OJ S: 2019/S 152-374114
Changes Text to be corrected in the original notice
Section number: II.2.14)
Place of text to be modified: Additional Information
Old value
Text:
โSubmissions must be submitted online via the electronic postbox on www.etenders.gov.ie before 4.00 p.m. on the 5.9.2019.โ New value
Text:
โSubmissions must be submitted online via the electronic postbox on www.etenders.gov.ie before 4.00 p.m. on the 10.9.2019.โ Text to be corrected in the original notice
Section number: IV.2.2)
Place of text to be modified: Time limit for receipt of tenders or requests to participate
Old value
Date: 2019-09-05 ๐
Time: 16:00
New value
Date: 2019-09-10 ๐
Time: 16:00
Source: OJS 2019/S 172-419024 (2019-09-03)
Contract award notice (2019-10-14) Contracting authority Name and addresses
Contact person: Corporate procurement unit
Object Award criteria
Quality criterion (name): Quality
Quality criterion (weighting): 30 %
Cost criterion (name): Price
Cost criterion (weighting): 70 %
Description
Additional information:
โSubmissions must be submitted online via the electronic postbox on www.etenders.gov.ie before 4 p.m. on the 5.9.2019.โ
Procedure Administrative information
Previous publication concerning this procedure: 2019/S 152-374114
Award of contract
1๏ธโฃ
Contract Number: 1
Title: The Construction of Airlie Park, Adamstown
Information on non-award
Other reasons (discontinuation of procedure)
Source: OJS 2019/S 200-485162 (2019-10-14)