Renovate and Extend Existing Stone Outbuildings at Rear of Property to provide a Community Cafe, Including Training Kitchen and Cafe Kitchen and Youth Centre and All Ancillary Works
Carry out full renovation works to existing stone outbuildings, yards, sewerage, surface water, etc. to include a stripping and re-slating of existing pitched roofs and carry out works to the front of the main building adjacent to the public road to include the removal of existing ramps, walls, etc. and installation of a new platform lift. A new gas boiler has been installed to serve the existing recently renovated main building and the proposed works. No works are required to the main 2 and half storey existing building. Please note grant funding for this project requires that the works are 50 % complete before 30.6.2019 and fully complete before 30.4.2020.
Deadline
The time limit for receipt of tenders was 2019-05-15.
The procurement was published on 2019-05-01.
Object Scope of the procurement
Title:
โRenovate and Extend Existing Stone Outbuildings at Rear of Property to provide a Community Cafe, Including Training Kitchen and Cafe Kitchen and Youth...โ
Title
Renovate and Extend Existing Stone Outbuildings at Rear of Property to provide a Community Cafe, Including Training Kitchen and Cafe Kitchen and Youth Centre and All Ancillary Works
The Old Garda Barracks
Show more
Products/services: Building construction work๐ฆ
Short description:
โCarry out full renovation works to existing stone outbuildings, yards, sewerage, surface water, etc. to include a stripping and re-slating of existing...โ
Short description
Carry out full renovation works to existing stone outbuildings, yards, sewerage, surface water, etc. to include a stripping and re-slating of existing pitched roofs and carry out works to the front of the main building adjacent to the public road to include the removal of existing ramps, walls, etc. and installation of a new platform lift. A new gas boiler has been installed to serve the existing recently renovated main building and the proposed works. No works are required to the main 2 and half storey existing building. Please note grant funding for this project requires that the works are 50 % complete before 30.6.2019 and fully complete before 30.4.2020.
Show more
Estimated value excluding VAT: EUR 250 000 ๐ฐ
1๏ธโฃ
Additional products/services: Construction work๐ฆ
Place of performance: รire/Ireland๐๏ธ
Main site or place of performance: The Green, Killaloe, County Clare.
Description of the procurement:
โCarry out full renovation works to existing stone outbuildings, yards, sewerage, surface water, etc. to include a stripping and re-slating of existing...โ
Description of the procurement
Carry out full renovation works to existing stone outbuildings, yards, sewerage, surface water, etc. to include a stripping and re-slating of existing pitched roofs and carry out works to the front of the main building adjacent to the public road to include the removal of existing ramps, walls, etc. and installation of a new platform lift. A new gas boiler has been installed to serve the existing recently renovated main building and the proposed works. No works are required to the main 2 and half storey existing building. Please note grant funding for this project requires that the works are 50 % complete before 30.6.2019 and fully complete before 30.4.2020.
Show more Award criteria
Price
Scope of the procurement
Estimated total value excluding VAT: EUR 250 000 ๐ฐ
Duration of the contract, framework agreement or dynamic purchasing system
The time frame below is expressed in number of months.
Description
Duration: 8
Information about the limits on the number of candidates to be invited
Envisaged minimum number: 3
Objective criteria for choosing the limited number of candidates:
โDee to limited time frame and need to commence works immediately on completion of tendering process it is expected to prove very difficult to get quotes...โ
Objective criteria for choosing the limited number of candidates
Dee to limited time frame and need to commence works immediately on completion of tendering process it is expected to prove very difficult to get quotes back from contractors.
Show more Information about variants
Variants will be accepted โ
Legal, economic, financial and technical information Economic and financial standing
List and brief description of selection criteria: โ availability,
โ cost,
โ experience,
โ resources.
Procedure Type of procedure
Restricted procedure
Accelerated procedure:
โThe works are funded by a grant. The conditions of the grant require 50 % of the works to be completed before 30.6.2019 and completion of works before 30.4.2020.โ
Accelerated procedure
The works are funded by a grant. The conditions of the grant require 50 % of the works to be completed before 30.6.2019 and completion of works before 30.4.2020.
Show more Administrative information
Time limit for receipt of tenders or requests to participate: 2019-05-15
17:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
The time frame below is expressed in number of months.
Minimum time frame during which the tenderer must maintain the tender: 1