The contract involves the provision of archaeological consultancy services required to assess and mitigate the archaeological impacts of construction of the c. 3,5 km long N72 Annakisha Realignment Scheme. The archaeological services required are to be delivered on-site and off-site by the consultant (including their sub-contractors) and include the submission of quality assured reports and archives in accordance with the Services Requirements and to the satisfaction of the relevant statutory authorities. For this current tender, it is anticipated that the following archaeological consultancy services will be required: โ test excavations and surveys [Stage (i)], โ pre-excavation services [Stage (ii)], โ archaeological excavation [Stage (iii)], โ post-excavation and dissemination [Stage (iv)], and โ archaeological Monitoring of Construction Works [Stage (i)k]. The on-site services are to be provided in the
Deadline
The time limit for receipt of tenders was 2019-08-15.
The procurement was published on 2019-07-16.
Suppliers
The following suppliers are mentioned in award decisions or other procurement documents:
Contract notice (2019-07-16) Object Scope of the procurement
Title: Archaeological services
Reference number: N73 AKR Archaeological Services
Short description:
The contract involves the provision of archaeological consultancy services required to assess and mitigate the archaeological impacts of construction of the c. 3,5 km long N72 Annakisha Realignment Scheme. The archaeological services required are to be delivered on-site and off-site by the consultant (including their sub-contractors) and include the submission of quality assured reports and archives in accordance with the Services Requirements and to the satisfaction of the relevant statutory authorities.
For this current tender, it is anticipated that the following archaeological consultancy services will be required:
โ test excavations and surveys [Stage (i)],
โ pre-excavation services [Stage (ii)],
โ archaeological excavation [Stage (iii)],
โ post-excavation and dissemination [Stage (iv)], and
โ archaeological Monitoring of Construction Works [Stage (i)k]. The on-site services are to be provided in the
The contract involves the provision of archaeological consultancy services required to assess and mitigate the archaeological impacts of construction of the c. 3,5 km long N72 Annakisha Realignment Scheme. The archaeological services required are to be delivered on-site and off-site by the consultant (including their sub-contractors) and include the submission of quality assured reports and archives in accordance with the Services Requirements and to the satisfaction of the relevant statutory authorities.
For this current tender, it is anticipated that the following archaeological consultancy services will be required:
โ test excavations and surveys [Stage (i)],
โ pre-excavation services [Stage (ii)],
โ archaeological excavation [Stage (iii)],
โ post-excavation and dissemination [Stage (iv)], and
โ archaeological Monitoring of Construction Works [Stage (i)k]. The on-site services are to be provided in the
Notice metadata
Original language: English ๐ฃ๏ธ
Document type: Contract notice
Nature of contract: Services
Regulation: European Union, with participation of GPA countries
Common procurement vocabulary (CPV)
Code: Archaeological services๐ฆ
Additional CPV: Excavation work at archaeological sites๐ฆ Place of performance
NUTS region: Southern๐๏ธ
Procedure
Procedure type: Open procedure
Type of bid: Submission for all lots
Award criteria
The most economic tender
Object Scope of the procurement
Short description:
The contract involves the provision of archaeological consultancy services required to assess and mitigate the archaeological impacts of construction of the c. 3,5 km long N72 Annakisha Realignment Scheme. The archaeological services required are to be delivered on-site and off-site by the consultant (including their sub-contractors) and include the submission of quality assured reports and archives in accordance with the Services Requirements and to the satisfaction of the relevant statutory authorities.
The contract involves the provision of archaeological consultancy services required to assess and mitigate the archaeological impacts of construction of the c. 3,5 km long N72 Annakisha Realignment Scheme. The archaeological services required are to be delivered on-site and off-site by the consultant (including their sub-contractors) and include the submission of quality assured reports and archives in accordance with the Services Requirements and to the satisfaction of the relevant statutory authorities.
For this current tender, it is anticipated that the following archaeological consultancy services will be required:
โ test excavations and surveys [Stage (i)],
โ pre-excavation services [Stage (ii)],
โ archaeological excavation [Stage (iii)],
โ post-excavation and dissemination [Stage (iv)], and
โ archaeological Monitoring of Construction Works [Stage (i)k]. The on-site services are to be provided in the
Estimated total value: 400 000 EUR ๐ฐ
Short description:
The contract involves the provision of archaeological consultancy services required to assess and mitigate the archaeological impacts of construction of the c. 3,5 km long N72 Annakisha Realignment Scheme. The archaeological services required are to be delivered on-site and off-site by the consultant (including their sub-contractors) and include the submission of quality assured reports and archives in accordance with the services requirements and to the satisfaction of the relevant statutory authorities.
The contract involves the provision of archaeological consultancy services required to assess and mitigate the archaeological impacts of construction of the c. 3,5 km long N72 Annakisha Realignment Scheme. The archaeological services required are to be delivered on-site and off-site by the consultant (including their sub-contractors) and include the submission of quality assured reports and archives in accordance with the services requirements and to the satisfaction of the relevant statutory authorities.
The N73 Annakisha Realignment Scheme received Part VIII Planning Permission on the 27.4.2015 and the CPO was approved by An Bord Pleanรกla (ref. No ABP-300570-18) in 25.4.2018. The project involves the realignment of approximately 3,5 km of existing N73 road (single carriageway) and ancillary works. Compulsory purchase orders have been made in respect of 33 properties with an aggregate area of c.11,332 hectares, c.6,497 hectares of which is described as land and c.4,835 hectares of which is described as road.
The N73 Annakisha Realignment Scheme received Part VIII Planning Permission on the 27.4.2015 and the CPO was approved by An Bord Pleanรกla (ref. No ABP-300570-18) in 25.4.2018. The project involves the realignment of approximately 3,5 km of existing N73 road (single carriageway) and ancillary works. Compulsory purchase orders have been made in respect of 33 properties with an aggregate area of c.11,332 hectares, c.6,497 hectares of which is described as land and c.4,835 hectares of which is described as road.
The project comprises an update to an original design concept for a smaller 1,2 km scheme (the N73 Annakisha South Realigment). Archaeological investigations were undertaken in 2012 (as part of a separate dual road scheme contract) on this former scheme footprintโdetails are available in the information pack provided. The current design iteration (now referred to as the N73 Annakisha Realignment Scheme) measures c. 3,5 km long. The majority of the extended scheme footprint was archaeologically tested in late 2014โdetails are in the information pack provided.
The project comprises an update to an original design concept for a smaller 1,2 km scheme (the N73 Annakisha South Realigment). Archaeological investigations were undertaken in 2012 (as part of a separate dual road scheme contract) on this former scheme footprintโdetails are available in the information pack provided. The current design iteration (now referred to as the N73 Annakisha Realignment Scheme) measures c. 3,5 km long. The majority of the extended scheme footprint was archaeologically tested in late 2014โdetails are in the information pack provided.
Legal, economic, financial and technical information Conditions for participation
Suitability to pursue the professional activity: Please refer to attached documentation for any/full details.
Economic and financial standing: Please refer to attached documentation for any/full details.
Minimum level(s) of standards: Please refer to attached documentation for any/full details.
Technical and professional ability: Please refer to attached documentation for any/full details.
Procedure
Legal basis: 32014L0024
Time of receipt of tenders: 17:00
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Tender validity period: 6 months
Tender opening date: 2019-08-15 ๐
Tender opening time: 17:00
Complementary information Review body
Name: The High Court
Postal address: Four Courts, Inns Quay
Postal town: Dublin 7
Country: Ireland ๐ฎ๐ช
Phone: +353 18886000๐
E-mail: highcourtcentraloffice@courts.ie๐ง
Internet address: http://www.courts.ie๐
Source: OJS 2019/S 138-340116 (2019-07-16)
Contract award notice (2020-05-08) Object Scope of the procurement
Short description:
The Contract involves the provision of archaeological consultancy services required to assess and mitigate the archaeological impacts of construction of the c. 3.5 km long N72 Annakisha Realignment Scheme. The archaeological services required are to be delivered onsite and offsite by the consultant (including their subcontractors) and include the submission of quality assured reports and archives in accordance with the services requirements and to the satisfaction of the relevant statutory authorities.
For this current tender, it is anticipated that the following archaeological consultancy services will be required:
โ test excavations and surveys [Stage (i)],
โ pre-excavation services [Stage (ii)],
โ archaeological excavation [Stage (iii)],
โ post-excavation and dissemination [Stage (iv)], and
โ archaeological monitoring of construction works [Stage (i)k].
The on-site services are to be provided in the
The Contract involves the provision of archaeological consultancy services required to assess and mitigate the archaeological impacts of construction of the c. 3.5 km long N72 Annakisha Realignment Scheme. The archaeological services required are to be delivered onsite and offsite by the consultant (including their subcontractors) and include the submission of quality assured reports and archives in accordance with the services requirements and to the satisfaction of the relevant statutory authorities.
For this current tender, it is anticipated that the following archaeological consultancy services will be required:
โ test excavations and surveys [Stage (i)],
โ pre-excavation services [Stage (ii)],
โ archaeological excavation [Stage (iii)],
โ post-excavation and dissemination [Stage (iv)], and
โ archaeological monitoring of construction works [Stage (i)k].
The on-site services are to be provided in the
Total value of the procurement: 390 091 EUR ๐ฐ
Notice metadata
Document type: Contract award notice
Nature of contract: Works
Object Scope of the procurement
Short description:
The Contract involves the provision of archaeological consultancy services required to assess and mitigate the archaeological impacts of construction of the c. 3.5 km long N72 Annakisha Realignment Scheme. The archaeological services required are to be delivered onsite and offsite by the consultant (including their subcontractors) and include the submission of quality assured reports and archives in accordance with the services requirements and to the satisfaction of the relevant statutory authorities.
The Contract involves the provision of archaeological consultancy services required to assess and mitigate the archaeological impacts of construction of the c. 3.5 km long N72 Annakisha Realignment Scheme. The archaeological services required are to be delivered onsite and offsite by the consultant (including their subcontractors) and include the submission of quality assured reports and archives in accordance with the services requirements and to the satisfaction of the relevant statutory authorities.
โ archaeological monitoring of construction works [Stage (i)k].
The on-site services are to be provided in the
The contract involves the provision of archaeological consultancy services required to assess and mitigate the archaeological impacts of construction of the c. 3.5 km long N72 Annakisha Realignment Scheme. The archaeological services required are to be delivered onsite and offsite by the consultant (including their subcontractors) and include the submission of quality assured reports and archives in accordance with the services requirements and to the satisfaction of the relevant statutory authorities.
The contract involves the provision of archaeological consultancy services required to assess and mitigate the archaeological impacts of construction of the c. 3.5 km long N72 Annakisha Realignment Scheme. The archaeological services required are to be delivered onsite and offsite by the consultant (including their subcontractors) and include the submission of quality assured reports and archives in accordance with the services requirements and to the satisfaction of the relevant statutory authorities.
The N73 Annakisha Realignment Scheme received Part VIII Planning Permission on the 27 April 2015 and the CPO was approved by An Bord Pleanรกla (ref. No ABP-300570-18) in 25 April 2018. The project involves the realignment of approximately 3.5 km of existing N73 road (single carriageway) and ancillary works. Compulsory purchase orders have been made in respect of 33 properties with an aggregate area of c.11 332 hectares, c.6 497 hectares of which is described as land and c.4 835 hectares of which is described as road.
The N73 Annakisha Realignment Scheme received Part VIII Planning Permission on the 27 April 2015 and the CPO was approved by An Bord Pleanรกla (ref. No ABP-300570-18) in 25 April 2018. The project involves the realignment of approximately 3.5 km of existing N73 road (single carriageway) and ancillary works. Compulsory purchase orders have been made in respect of 33 properties with an aggregate area of c.11 332 hectares, c.6 497 hectares of which is described as land and c.4 835 hectares of which is described as road.
The project comprises an update to an original design concept for a smaller 1.2 km scheme (the N73 Annakisha South Realigment). Archaeological investigations were undertaken in 2012 (as part of a separate dual road scheme contract) on this former scheme footprint โ details are available in the information pack provided. The current design iteration (now referred to as the N73 Annakisha Realignment Scheme) measures c. 3.5 km long. The majority of the extended scheme footprint was archaeologically tested in late 2014 โ details are in the information pack provided.
The project comprises an update to an original design concept for a smaller 1.2 km scheme (the N73 Annakisha South Realigment). Archaeological investigations were undertaken in 2012 (as part of a separate dual road scheme contract) on this former scheme footprint โ details are available in the information pack provided. The current design iteration (now referred to as the N73 Annakisha Realignment Scheme) measures c. 3.5 km long. The majority of the extended scheme footprint was archaeologically tested in late 2014 โ details are in the information pack provided.
Award of contract
Date of contract conclusion: 2019-09-26 ๐
Name: TVAS (Ireland) ltd
Postal address: Ahish, Ballinruan, Co. Clare
Postal town: Crusheen
Country: Ireland ๐ฎ๐ช
Total value of the procurement: 390 091 EUR ๐ฐ
Information about tenders
Number of tenders received: 4
Source: OJS 2020/S 093-221358 (2020-05-08)