Description of the procurement
Facade installation reserved specialist:
The development will consist of:
1) The restoration and refurbishment of Spruce House, former dispensary building, approximately, 445 m in area;
2) The construction of a new 7 storey (over basement) office building of c. 6 333 m;
3) Site development works include hard landscaping, boundary treatment and all other ancillary site works.
The faรงade works cover approximately 3 250 m. The building facade primarily consists of the following materials and systems:
โ aluminium framed bespoke unitised curtain wall screen to the main elevations,
โ aluminium framed stick curtain wall screens with infill glazing and opening sections (to the ground floor areas, link building between to the Dispensary Building, rooftop stair enclosure),
โ proprietary aluminium framed rainscreen cladding to the soffits and staff entrance,
โ aluminium rainscreen panels,
โ ventilation louvres,
โ substation cladding.