Iarnród Éireann — Irish Rail “IE” has a requirement for a multi-disciplinary consultancy team to support IE in the proposed expansion of the Dublin area rapid transit network “DART”.
This requirement is for a team to support the proposed expansion of the Maynooth line and City Centre enhancements including but not limited to:
— preparation of the designs,
— undertake the environmental impact assessment,
— manage the Railway order process,
— tender preparation and evaluation,
— with an option for design support during construction stage.
Deadline
The time limit for receipt of tenders was 2019-05-13.
The procurement was published on 2019-04-09.
Suppliers
The following suppliers are mentioned in award decisions or other procurement documents:
Object Scope of the procurement
Title:
“DART Expansion Multi-disciplinary Consultancy Team Maynooth line and City Centre Enhancements
7240”
Products/services: Infrastructure works consultancy services📦
Short description:
“Iarnród Éireann — Irish Rail “IE” has a requirement for a multi-disciplinary consultancy team to support IE in the proposed expansion of the Dublin area...”
Short description
Iarnród Éireann — Irish Rail “IE” has a requirement for a multi-disciplinary consultancy team to support IE in the proposed expansion of the Dublin area rapid transit network “DART”.
This requirement is for a team to support the proposed expansion of the Maynooth line and City Centre enhancements including but not limited to:
— preparation of the designs,
— undertake the environmental impact assessment,
— manage the Railway order process,
— tender preparation and evaluation,
— with an option for design support during construction stage.
Iarnród Éireann — Irish Rail "IE" has a requirement for a multi-disciplinary consultancy team to support IE in the proposed expansion of the Dublin area rapid transit network “DART”.
This requirement is for a team to support the proposed expansion of the Maynooth line and City Centre enhancements including but not limited to:
— preparation of the designs,
— undertake the environmental impact assessment,
— manage the Railway order process,
— tender preparation and evaluation,
— with an option for design support during construction stage.
Show more Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
Duration of the contract, framework agreement or dynamic purchasing system
The time frame below is expressed in number of months.
Description
Duration: 24
Information about options
Options ✅
Description of options:
“This is a contract for 24 months with an option to extend during the construction phase for 36 months or until construction is completed.”
Legal, economic, financial and technical information Economic and financial standing
Selection criteria as stated in the procurement documents
Technical and professional ability
Selection criteria as stated in the procurement documents
Conditions for participation
List and brief description of rules and criteria: See Procurement documents.
Deposits and guarantees required: See Procurement documents.
Main financing conditions and payment arrangements and/or reference to the relevant provisions governing them: See Procurement documents.
Legal form to be taken by the group of economic operators to whom the contract is to be awarded: See Procurement documents.
Procedure Type of procedure
Negotiated procedure with prior call for competition
Administrative information
Time limit for receipt of tenders or requests to participate: 2019-05-13
12:00 📅
Languages in which tenders or requests to participate may be submitted: English 🗣️
The time frame below is expressed in number of months.
Minimum time frame during which the tenderer must maintain the tender: 6
Complementary information Information about electronic workflows
Electronic ordering will be used
Electronic payment will be used
Review body
Name: The High Court
Postal address: Central Office of the High Court, Four Courts
Postal town: Dublin
Postal code: 7
Country: Ireland 🇮🇪
Phone: +353 18886511📞
E-mail: highcourtcentraloffice@courts.ie📧
Fax: +353 18886125 📠
URL: www.courts.ie🌏
Source: OJS 2019/S 073-174045 (2019-04-09)
Contract award notice (2019-12-19) Object Scope of the procurement
Title:
“DART Expansion Multi-disciplinary Consultancy Team Maynooth Line and City Centre Enhancements
7240”
Short description:
“Iarnród Éireann — Irish Rail ‘IE’ has a requirement for a multi-disciplinary consultancy team to support IE in the proposed expansion of the Dublin area...”
Short description
Iarnród Éireann — Irish Rail ‘IE’ has a requirement for a multi-disciplinary consultancy team to support IE in the proposed expansion of the Dublin area Rapid transit network ‘DART’.
This requirement is for a team to support the proposed expansion of the Maynooth line and City Centre enhancements including but not limited to:
— preparation of the designs,
— undertake the environmental impact assessment,
— manage the railway order process,
— tender preparation and evaluation,
— with an option for design support during construction stage.
Show more Description
Main site or place of performance: Dublin.
Description of the procurement:
“Iarnród Éireann — Irish Rail ‘IE’ has a requirement for a multi-disciplinary consultancy team to support IE in the proposed expansion of the Dublin area...”
Description of the procurement
Iarnród Éireann — Irish Rail ‘IE’ has a requirement for a multi-disciplinary consultancy team to support IE in the proposed expansion of the Dublin area Rapid transit network ‘DART’.
This requirement is for a team to support the proposed expansion of the Maynooth line and City Centre enhancements including but not limited to:
— preparation of the designs,
— undertake the environmental impact assessment,
— manage the railway order process,
— tender preparation and evaluation,
— with an option for design support during construction stage.
Show more Award criteria
Quality criterion (name): Proposed project team
Quality criterion (weighting): 14
Quality criterion (name): Proposed methodologies for undertaking design development process etc.
Quality criterion (weighting): 12
Quality criterion (name): Proposed methodology for management of Railway order process
Quality criterion (weighting): 13
Quality criterion (name): Proposed methodology for cost management
Quality criterion (weighting): 2
Quality criterion (name): Identification of critical issues in forming a procurement strategy
Quality criterion (name): Proposed MDC delivery program
Quality criterion (name): Proposed MDC Corporate governance systems
Quality criterion (name): Proposed methodology for design support
Quality criterion (weighting): 3
Cost criterion (name): Cost
Cost criterion (weighting): 50
Procedure Administrative information
Previous publication concerning this procedure: 2019/S 073-174045
Award of contract
1️⃣
Contract Number: 1
Title:
“DART Expansion Multi-disciplinary Consultancy Team Maynooth Line and City Centre Enhancements”
Date of conclusion of the contract: 2019-12-18 📅
Information about tenders
Number of tenders received: 4
Number of tenders received from SMEs: 0
Number of tenders received from tenderers from other EU Member States: 4
Number of tenders received from tenderers from non-EU Member States: 0
Name and address of the contractor
Name: IDOM Consulting Engineering Architecture
National registration number: 908238
Postal address: Ormond Building, 31-36 Ormond Quay
Postal town: Dublin
Postal code: D07E624
Country: Ireland 🇮🇪
Phone: +34 630026433📞
E-mail: evarillas@idom.com📧
Region: Éire/Ireland🏙️
URL: http://www.idom.com🌏
The contractor is an SME
Source: OJS 2019/S 247-611027 (2019-12-19)