Consultancy services are required for a design team to design and construct a new Leisure Centre on the site of the existing Buncrana Leisure Centre. The project will include for the demolition of the existing Leisure Centre and the design of a new state of the art, sustainable facility to serve the people of Buncrana and the surrounding region. This tender is to be carried out under the restricted procedure for the purposes of assessing applications to short list a number of suitable candidates, who will then proceed to the detailed tender stage, to establish the project team. This tender is separated into 2 lots, one lot for an ‘Integrated Design Team’ who will be responsible for the design and construction elements of the project and one lot for a ‘Project Manager/Quantity Surveyor Team’ to assist and manage the project with regard to time, milestones and costs. Further details of the project are available in the ‘Project Information Memorandum’ document.
Deadline
The time limit for receipt of tenders was 2020-01-10.
The procurement was published on 2019-11-29.
Contract notice (2019-11-29) Object Scope of the procurement
Title: Architectural and related services
Reference number: Buncrana Leisure Centre
Short description:
“Consultancy services are required for a design team to design and construct a new Leisure Centre on the site of the existing Buncrana Leisure Centre. The...”
Short description
Consultancy services are required for a design team to design and construct a new Leisure Centre on the site of the existing Buncrana Leisure Centre. The project will include for the demolition of the existing Leisure Centre and the design of a new state of the art, sustainable facility to serve the people of Buncrana and the surrounding region. This tender is to be carried out under the restricted procedure for the purposes of assessing applications to short list a number of suitable candidates, who will then proceed to the detailed tender stage, to establish the project team. This tender is separated into 2 lots, one lot for an ‘Integrated Design Team’ who will be responsible for the design and construction elements of the project and one lot for a ‘Project Manager/Quantity Surveyor Team’ to assist and manage the project with regard to time, milestones and costs. Further details of the project are available in the ‘Project Information Memorandum’ document.