Supply of 2 X Motor and gearbox sets for power generation from a 60 kW Hydrokinetic Turbine

Design Pro Ltd.

Design Pro Ltd is developing and testing a hydrokinetic turbine to generate electricity from water flows. They are developing a 60 kW turbine unit comprised of 2 X turbines each driving a 30 kW motor, and require supply of 2 X motor and gearbox sets that will integrate with the turbine units to generate electrical power from the kinetic energy

Deadline
The time limit for receipt of tenders was 2018-07-25. The procurement was published on 2018-06-19.

Who?

What?

Where?

Procurement history
Date Document
2018-06-19 Contract notice