The development is a 6 and 4-storey building over a double basement, 10 060 sq.m in area with an approx. 9 275 sq.m basement for car parking and ancillary accommodation on a site of circa 0,86 ha.
The office layout accommodates a mixture of both open plan and cellular offices. The brief also includes work-related, shared accommodation such as a gym, locker rooms, secure storage, showers and toilets, tea stations/kitchens, private outdoor space, along with sufficient meeting rooms and conference facilities. Three distinct blocks of accommodation cluster about a central atrium space that provides vertical circulation, natural light and natural ventilation into the offices. There is a mixture of naturally ventilated offices and the design exploits the existing site slope in the construction of the basement. The faรงade design is large profiled precast panels with curtain wall glazing floor to floor.
Deadline
The time limit for receipt of tenders was 2018-11-05.
The procurement was published on 2018-10-04.
Suppliers
The following suppliers are mentioned in award decisions or other procurement documents:
Object Scope of the procurement
Title:
โGarda Security and Crime Operations Centre, Military Road, Dublin 8 โ Main Contractor
Main Contractorโ
Products/services: Construction work๐ฆ
Short description:
โThe development is a 6 and 4-storey building over a double basement, 10 060 sq.m in area with an approx. 9 275 sq.m basement for car parking and ancillary...โ
Short description
The development is a 6 and 4-storey building over a double basement, 10 060 sq.m in area with an approx. 9 275 sq.m basement for car parking and ancillary accommodation on a site of circa 0,86 ha.
The office layout accommodates a mixture of both open plan and cellular offices. The brief also includes work-related, shared accommodation such as a gym, locker rooms, secure storage, showers and toilets, tea stations/kitchens, private outdoor space, along with sufficient meeting rooms and conference facilities. Three distinct blocks of accommodation cluster about a central atrium space that provides vertical circulation, natural light and natural ventilation into the offices. There is a mixture of naturally ventilated offices and the design exploits the existing site slope in the construction of the basement. The faรงade design is large profiled precast panels with curtain wall glazing floor to floor.
The development is a 6 and 4-storey building over a double basement, 10 060 sq.m in area with an approx. 9 275 sq.m basement for car parking and ancillary accommodation on a site of circa 0,86 ha.
The office layout accommodates a mixture of both open plan and cellular offices. The brief also includes work-related, shared accommodation such as a gym, locker rooms, secure storage, showers and toilets, tea stations/kitchens, private outdoor space, along with sufficient meeting rooms and conference facilities. Three distinct blocks of accommodation cluster about a central atrium space that provides vertical circulation, natural light and natural ventilation into the offices. There is a mixture of naturally ventilated offices and the design exploits the existing site slope in the construction of the basement. The faรงade design is large profiled precast panels with curtain wall glazing floor to floor.
In order to facilitate the development, the removal of some of the existing stone walls and the existing modern blockwork shed of 105 sq.m is required. A section of the boundary wall along military road will also be removed to allow for a new secure vehicular access into the site. The development will also include for the provision of hard and soft landscaping, a new stone boundary wall to military road, an ESB substation, a 7 metre garda telecommunication mast on the sixth storey core roof, a 415 sq.m single storey services building with a green roof, new foul drainage, attenuated surface water drainage and all ancillary site structures and works. The design protects the Deer Park Wall, a designated Protected Structure (DCC Reference RPS 5246) which runs along the eastern perimeter of the site and forms part of the works.
The development will be fully accessible and will be energy efficient with a low environmental impact. The development will be required to comply with the proposed new Part L Building Regulations other than dwellings 2017 and NZEB.
Show more Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
Duration of the contract, framework agreement or dynamic purchasing system
The time frame below is expressed in number of months.
Description
Duration: 30
Information about the limits on the number of candidates to be invited
Envisaged minimum number: 5
Maximum number: 8
Objective criteria for choosing the limited number of candidates: Please refer to the suitability assessment questionnaire document.
Description
Additional information:
โโ please consult the associated pre-qualification documentation, which contains full instructions regarding the submissions required for this competition,
โ...โ
Additional information
โ please consult the associated pre-qualification documentation, which contains full instructions regarding the submissions required for this competition,
โ please provide 1 hard copy and 1 soft copy (on CD Or USB stick in PDF format) of your submission,
โ submissions cannot be made via e-tenders.
Legal, economic, financial and technical information Conditions for participation
List and brief description of conditions: Please refer to SAQ document
Economic and financial standing
Selection criteria as stated in the procurement documents
Technical and professional ability
Selection criteria as stated in the procurement documents
Information about staff responsible for the performance of the contract
Obligation to indicate the names and professional qualifications of the staff assigned to performing the contract
Procedure Type of procedure
Restricted procedure
Administrative information
Time limit for receipt of tenders or requests to participate: 2018-11-05
12:00 ๐
Languages in which tenders or requests to participate may be submitted: English ๐ฃ๏ธ
Complementary information Review body
Name: The Commissioners of Public Works in Ireland
Postal address: Office of Public Works
Postal town: Trim
Country: Ireland ๐ฎ๐ช
Phone: +353 16476163๐
E-mail: militaryrd@opw.ie๐ง
URL: www.opw.ie๐
Source: OJS 2018/S 194-437943 (2018-10-04)
Contract award notice (2020-02-25) Contracting authority Name and addresses
Postal address: Jonathan Swift Street, Co. Meath
Postal code: C15 NX36
Object Scope of the procurement
Short description:
โThe development is a 6 and 4-storey building over a double basement, 10 060 m in area with an approx. 9 275 m basement for car parking and ancillary...โ
Short description
The development is a 6 and 4-storey building over a double basement, 10 060 m in area with an approx. 9 275 m basement for car parking and ancillary accommodation on a site of circa 0,86 ha.
The office layout accommodates a mixture of both open plan and cellular offices. The brief also includes work-related, shared accommodation such as a gym, locker rooms, secure storage, showers and toilets, tea stations/kitchens, private outdoor space, along with sufficient meeting rooms and conference facilities. Three distinct blocks of accommodation cluster about a central atrium space that provides vertical circulation, natural light and natural ventilation into the offices. There is a mixture of naturally ventilated offices and the design exploits the existing site slope in the construction of the basement. The faรงade design is large profiled precast panels with curtain wall glazing floor to floor.
Show more
Currency code: EUR ๐ฐ
Total value of the procurement (excluding VAT) (lowest offer): 73868405.90
Total value of the procurement (excluding VAT) (highest offer): 80850500.00
Description
Main site or place of performance: Military Road, Dublin 8.
Description of the procurement:
โThe development is a 6 and 4-storey building over a double basement, 10 060 m in area with an approx. 9 275 m basement for car parking and ancillary...โ
Description of the procurement
The development is a 6 and 4-storey building over a double basement, 10 060 m in area with an approx. 9 275 m basement for car parking and ancillary accommodation on a site of circa 0,86 ha.
The office layout accommodates a mixture of both open plan and cellular offices. The brief also includes work-related, shared accommodation such as a gym, locker rooms, secure storage, showers and toilets, tea stations/kitchens, private outdoor space, along with sufficient meeting rooms and conference facilities. Three distinct blocks of accommodation cluster about a central atrium space that provides vertical circulation, natural light and natural ventilation into the offices. There is a mixture of naturally ventilated offices and the design exploits the existing site slope in the construction of the basement. The faรงade design is large profiled precast panels with curtain wall glazing floor to floor.
In order to facilitate the development, the removal of some of the existing stone walls and the existing modern blockwork shed of 105 m is required. A section of the boundary wall along Military Road will also be removed to allow for a new secure vehicular access into the site. The development will also include for the provision of hard and soft landscaping, a new stone boundary wall to Military Road, an ESB substation, a 7 metre Garda telecommunication mast on the sixth storey core roof, a 415 m. single storey services building with a green roof, new foul drainage, attenuated surface water drainage and all ancillary site structures and works. The design protects the Deer Park Wall, a designated Protected Structure (DCC Reference RPS 5246) which runs along the eastern perimeter of the site and forms part of the works.
The development will be fully accessible and will be energy efficient with a low environmental impact. The development will be required to comply with the proposed new Part L Building Regulations other than dwellings 2017 and NZEB.
Show more Award criteria
Quality criterion (name): Quality Criteria listed in the ITT
Quality criterion (weighting): 30 %
Price (weighting): 70 %
Description
Additional information:
โโ please consult the associated pre-qualification documentation, which contains full instructions regarding the submissions required for this competition,
โ...โ
Additional information
โ please consult the associated pre-qualification documentation, which contains full instructions regarding the submissions required for this competition,
โ please provide 1 hard copy and 1 soft copy (On CD or USB stick in PDF format) of your submission,
โ submissions cannot be made via eTenders.
Procedure Administrative information
Previous publication concerning this procedure: 2018/S 194-437943
Award of contract
1๏ธโฃ
Title: Garda Security and Crime Operations Centre, Military Road โ Main Works Contract
Date of conclusion of the contract: 2020-02-10 ๐
Information about tenders
Number of tenders received: 5
Number of tenders received from SMEs: 0
Number of tenders received from tenderers from other EU Member States: 0
Number of tenders received from tenderers from non-EU Member States: 0
Number of tenders received by electronic means: 0
Name and address of the contractor
Name: John Paul Construction Ltd
Postal address: Dundrum Business Park, Dundrum Road
Postal town: Dublin
Postal code: D14E 1R9
Country: Ireland ๐ฎ๐ช
Phone: +353 12156100๐
E-mail: info@johnpaul.ie๐ง
Region: Dublin๐๏ธ
URL: www.johnpaul.ie๐
The contractor is an SME
Information on value of the contract/lot (excluding VAT)
Currency code: EUR ๐ฐ
Lowest offer: 73868405.90
Highest offer: 80850500.00
Source: OJS 2020/S 041-096148 (2020-02-25)