Professional Design Team Services for delivery of new Acute Inpatient Ward Block at University Hospital Limerick
The Health Service Executive (HSE) is planning the design and construction of a new acute inpatient ward block development at the University Hospital Limerick Campus, Dooradoyle, Limerick to be constructed overhead the hospital's new emergency department (at level 0) and dialysis unit (at level 1). A total of 4 inpatient wards, each containing 24 single inpatient rooms are envisaged along with hospital street link corridors at each level. The proposed building extension is anticipated to be in the region of 1 935 m overall per level giving a gross floor area of circa 7 750 m for the project excluding plant room space which will be additional. The Health Service Executive now wish to procure and appoint a design team for the project to include Architect (including Employers Representative and Project Supervisor Design Process roles), Fire Engineer, Quantity Surveyor, Mechanical and Electrical Engineer and Civil and Structural Engineer. The ward design will be to a high quality standard.
Deadline
The time limit for receipt of tenders was 2017-03-14.
The procurement was published on 2017-02-02.
Who?
What?
Where?
Procurement history
Date |
Document |
2017-02-02
|
Contract notice
|