EirGrid have identified a requirement to procure a marine survey contractor to carry out high-quality estuarine geophysical, geotechnical and benthic marine surveys in the Shannon Estuary between Moneypoint in County Clare and Kilpaddoge in County Kerry along with associated reporting. The approximate length of the estuary crossings which are the subject of this survey is 3 kilometres. The seabed/estuary bed survey programme will be undertaken in order to enable optimal cable engineering of a route viable for installation.
The survey will comprise of the following activities:
โ Marine Geophysical Surveys (Autumn 2017),
โ Marine Geotechnical Sampling and Laboratory Tests (Autumn 2017 following completion of the Marine Geophysical Surveys),
โ Benthic Survey (Autumn 2017 Maybe required).
Please see the Information Memorandum and Pre Qualification Questionnaire attached to the eTenders notice for full details.
Deadline
The time limit for receipt of tenders was 2017-05-11.
The procurement was published on 2017-04-11.
Suppliers
The following suppliers are mentioned in award decisions or other procurement documents:
Object Scope of the procurement
Title: Marine Survey โ Cross-Shannon Cable Project
ENQEIR578
Products/services: Marine survey services๐ฆ
Short description:
โThis procurement has been completed:
EirGrid have identified a requirement to procure a marine survey contractor to carry out high-quality estuarine...โ
Short description
This procurement has been completed:
EirGrid have identified a requirement to procure a marine survey contractor to carry out high-quality estuarine geophysical, geotechnical and benthic marine surveys in the Shannon Estuary between Moneypoint in County Clare and Kilpaddoge in County Kerry along with associated reporting. The approximate length of the estuary crossings which are the subject of this survey is 3 kilometres.The seabed/estuary bed survey programme will be undertaken in order to enable optimal cable engineering of a route viable for installation.
The survey will comprise of the following activities:
โ Marine Geophysical Surveys (Autumn 2017),
โ Marine Geotechnical Sampling and Laboratory Tests (Autumn 2017 following completion of the Marine Geophysical Surveys),
โ Benthic Survey (Autumn 2017 Maybe required).
Please see the Information Memorandum and Pre Qualification Questionnaire attached to the eTenders notice for full details.
Show more
Total value of the procurement (excluding VAT): EUR 1 210 456 ๐ฐ
1๏ธโฃ
Additional products/services: Marine survey services๐ฆ
Place of performance: รire/Ireland๐๏ธ
Main site or place of performance: Ireland
Description of the procurement:
โHigh levels of renewable generation are currently being integrated into the transmission and distribution systems in the South and West of Ireland. At times...โ
Description of the procurement
High levels of renewable generation are currently being integrated into the transmission and distribution systems in the South and West of Ireland. At times of high wind generation output, it is expected that wind generation will displace conventional generation on the system in order of economic merit, while respecting operational constraints. As a consequence of this, at times of high wind, large bulk power flows are expected to flow from the West and Southwest towards the large load centres on the East coast. A system reinforcement is required to facilitate these projected power flows, as well as to resolve other network issues including voltage collapse, large phase angles and thermal issues.
Part of the system reinforcement required includes the development of the Moneypoint โ Kilpaddoge 400 kV circuit. This will involve the installation of an additional cross Shannon cable at 400kV between the existing substations at Moneypoint Co. Clare and Kilpaddoge Co. Kerry, as well as the installation of a new 400/220 kV transformer at Kilpaddoge substation.
EirGrid have identified a requirement to procure a marine survey contractor to carry out high-quality estuarine geophysical, geotechnical and benthic marine surveys in the Shannon Estuary between Moneypoint in County Clare and Kilpaddoge in County Kerry along with associated reporting. The approximate length of the estuary crossings which are the subject of this survey is 3 kilometres.The seabed/estuary bed survey programme will be undertaken in order to enable optimal cable engineering of a route viable for installation.
The survey will comprise of the following activities:
โ Marine Geophysical Surveys (Autumn 2017),
โ Marine Geotechnical Sampling and Laboratory Tests (Autumn 2017 following completion of the Marine Geophysical Surveys),
โ Benthic Survey (Autumn 2017 Maybe required).
Please see the Information Memorandum and Pre Qualification Questionnaire attached to the eTenders notice for full details.
Show more Award criteria
Quality criterion (name): Technical Evaluation
Quality criterion (weighting): 55 %
Quality criterion (name): Legal Evaluation
Quality criterion (weighting): 5 %
Price (weighting): 40 %
Information about options
Options โ
Description of options: Benthic Surveys โ Maybe required
Procedure Type of procedure
Competitive procedure with negotiation
Administrative information
Previous publication concerning this procedure: 2017/S 074-142423
Award of contract
1๏ธโฃ
Contract Number: 1
Title: Marine Survey โ Cross-Shannon Cable Project
Date of conclusion of the contract: 2018-07-27 ๐
Information about tenders
Number of tenders received: 2
Number of tenders received from SMEs: 0
Name and address of the contractor
Name: Rina
National registration number: 03476550102
Postal address: Via S. Nazaro 19, 16145 Genoa
Postal town: Genoa
Country: Italy ๐ฎ๐น
Region: Italia ๐๏ธ
The contractor is an SME
Information on value of the contract/lot (excluding VAT)
Total value of the contract/lot: EUR 1 210 456 ๐ฐ
Complementary information Review body
Name: The High Court
Postal address: Four Courts
Postal town: Dublin
Postal code: 7
Country: Ireland ๐ฎ๐ช
Phone: +353 18886000๐
URL: http://www.courts.ie/๐ Review procedure
Precise information on deadline(s) for review procedures:
โPrecise information on deadline(s) for review procedures:
The contracting authority will not conclude this contract to which a standstill period applies in...โ
Precise information on deadline(s) for review procedures
Precise information on deadline(s) for review procedures:
The contracting authority will not conclude this contract to which a standstill period applies in accordance with Council Directive 2014/25/EU of the European Parliament and of the Council, until after the expiry of the standstill period which commences on the day following the date of notification on concerned candidates and tenderers. The duration of the standstill period will be 14 calendar days where notifications are sent electronically or by fax and 16 calendar days where these are sent by any other means. The Statutory Instrument mentioned above provides that review procedures are available in the High Court to a person who has or has had an interest in obtaining the reviewable public contract and alleges that he or she has been harmed or is at risk of being harmed by an infringement of the law in relation in this contract.
Show more Service from which information about the review procedure may be obtained
Name: Central office of the High Courts (Appeal Section)
Postal address: Ground Floor, East Wing, Inns Quay
Postal town: Dublin
Postal code: 7
Country: Ireland ๐ฎ๐ช
Phone: +353 18886000๐
URL: http://www.courts.ie/๐
Source: OJS 2018/S 167-380846 (2018-08-28)