Design and Construction of Slieve Bloom Mountain Bike Trail Centre (Phase 1) in Co. Offaly and Laois

Coillte CGA

To access the Qualification Questionnaire please log on to (http://www.coillte.ie/) go to Suppliers โ€” click on SMS link to access Coillte's Supplier Management System (SMS) or click on the direct link below;
https://supplierlive.proactisp2p.com/Account/Login
The first phase (to which this PQQ and subsequent tender applies) will design and build approximately 27 kms of singletrack non-bitmac mountain bike trails and these will link with a further 8 kms of existing forest roads to provide a total of 35 kms of trail network.

Deadline

The time limit for receipt of tenders was 2017-12-04. The procurement was published on 2017-11-03.

Who? What? Where?
Procurement history
Date Document
2017-11-03 Contract notice
Contract notice (2017-11-03)
Object
Scope of the procurement
Title: Engineering works and construction works
Reference number: Coillte
Short description:
To access the Qualification Questionnaire please log on to (http://www.coillte.ie/) go to Suppliers โ€” click on SMS link to access Coillte's Supplier Management System (SMS) or click on the direct link below; https://supplierlive.proactisp2p.com/Account/Login The first phase (to which this PQQ and subsequent tender applies) will design and build approximately 27 kms of singletrack non-bitmac mountain bike trails and these will link with a further 8 kms of existing forest roads to provide a total of 35 kms of trail network.
Show more
Notice metadata
Original language: English ๐Ÿ—ฃ๏ธ
Document type: Contract notice
Nature of contract: Services
Regulation: European Union
Common procurement vocabulary (CPV)
Code: Engineering works and construction works ๐Ÿ“ฆ
Additional CPV: Works for complete or part construction and civil engineering work ๐Ÿ“ฆ
Place of performance
NUTS region: ร‰ire/Ireland ๐Ÿ™๏ธ

Procedure
Procedure type: Open procedure
Type of bid: Submission for all lots
Award criteria
The most economic tender

Contracting authority
Identity
Country: Ireland ๐Ÿ‡ฎ๐Ÿ‡ช
Awarding authority type: Body governed by public law
Awarding authority name: Coillte CGA
Postal address: Newtownmountkennedy, Co. Wicklow
Postal town: Wicklow
Contact
Internet address: http://www.coillte.ie ๐ŸŒ
E-mail: sinead.cronin@coillte.ie ๐Ÿ“ง
Phone: +353 871349072 ๐Ÿ“ž
URL for documents: https://supplierlive.proactisp2p.com/Account/Login ๐ŸŒ
URL for participation: http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=120943&B=ETENDERS_SIMPLE ๐ŸŒ

Reference
Dates
Date dispatched: 2017-11-03 ๐Ÿ“…
Submission deadline: 2017-12-04 ๐Ÿ“…
Publication date: 2017-11-07 ๐Ÿ“…
Identifiers
Notice number: 2017/S 213-442699
OJ-S issue: 213
Additional information
The first phase (to which this PQQ and subsequent tender applies) will design and build approximately 27 kms of singletrack non-bitmac mountain bike trails and these will link with a further 8 kms of existing forest roads to provide a total of 35 kms of trail network.
Show more

Object
Scope of the procurement
Short description:
To access the Qualification Questionnaire please log on to (http://www.coillte.ie/) go to Suppliers โ€” click on SMS link to access Coillte's Supplier Management System (SMS) or click on the direct link below;
The first phase (to which this PQQ and subsequent tender applies) will design and build approximately 27 kms of singletrack non-bitmac mountain bike trails and these will link with a further 8 kms of existing forest roads to provide a total of 35 kms of trail network.
Show more
Estimated total value: 1 100 000 EUR ๐Ÿ’ฐ
Short description:
The mountain-bike trail network when completed will comprise of more than 100 kms of trails in the Slieve Bloom Mountains and was granted planning permission by Laois and Offaly County Councils in March 2017. It is centred on 2 trailheads, 1 near/in Kinnitty village in Co. Offaly and 1 in the heart of the Baunreagh valley, Co. Laois.
Show more
The first phase (to which this PQQ and subsequent tender applies) will design and build approximately 27 kms of singletrack non-bitmac mountain bike trails and these will link with a further 8 kms of existing forest roads to provide a total of 35 kms of trail network. The first phase will build trails centred at both trailheads and both will be connected via the public road over the county boundary. The first phase will also include the construction of rural public road crossings, a footbridge, hard standing for car-parking and installation of signage and waymarking.
Show more
The macro-design carried out to date for the trail network has identified suitable trail corridors for each trail section, within which the definitive trail line will be designed and built. The corridors are up to a maximum of 100 m width and the trail construction zone will be a maximum of 5 m width within that corridor. The finished trail surface will be no more than 600 mm width within that trail construction zone (unless otherwise specified).
Show more
Estimated value excluding VAT: 1 100 000 EUR ๐Ÿ’ฐ
Duration: 7 months
Additional information:
The first phase (to which this PQQ and subsequent tender applies) will design and build approximately 27 kms of singletrack non-bitmac mountain bike trails and these will link with a further 8 kms of existing forest roads to provide a total of 35 kms of trail network.
Show more
Place of performance
Main site or place of performance: County Offaly/Laois.

Procedure
Time of receipt of tenders: 15:00
Languages in which tenders or requests to participate may be submitted: English ๐Ÿ—ฃ๏ธ
Tender opening date: 2017-12-04 ๐Ÿ“…
Tender opening time: 15:00

Contracting authority
Contact
Contact point: Sinead Cronin
Internet address: www.coillte.ie ๐ŸŒ
Address of the buyer profile: https://irl.eu-supply.com/ctm/Company/CompanyInformation/Index/159 ๐ŸŒ
Documents URL: https://supplierlive.proactisp2p.com/Account/Login ๐ŸŒ

Complementary information
Review body
Name: Coillte
Postal town: Cavan
Country: Ireland ๐Ÿ‡ฎ๐Ÿ‡ช
E-mail: sinead.cronin@coillte.ie ๐Ÿ“ง
Source: OJS 2017/S 213-442699 (2017-11-03)