Iarnrod Éireann (IÉ) wish to pre-qualify experienced and proven companies to tender for the construction of a new underbridge (UBC43A) at 18 miles 880 yards on the Dublin-Cork railway line. The project will be carried out by Iarnród Éireann as enabling works for Kildare County Council to facilitate the construction of the combined M7 Osberstown Interchange and R407 Sallins Bypass Scheme. The proposed R407 Sallins Bypass, a dual carriageway, will cross under the Cork Line at 18 miles 880 yards for which a new under-bridge is to be constructed to accommodate same. A full railway shut-down for 84-hours over the Easter period 2018 will be in place to facilitate installation of the bridge units and wing-wall units. The proposed construction duration will be 12 months. A Pre-Qualification Questionnaire, and drawings to provide some overview information regarding the scope of the works as currently anticipated, are both attached to this notice.
Deadline
The time limit for receipt of tenders was 2017-03-27.
The procurement was published on 2017-02-21.
Suppliers
The following suppliers are mentioned in award decisions or other procurement documents:
Contract notice (2017-02-21) Object Scope of the procurement
Title: Railway bridge construction work
Reference number: 6820
Short description:
Iarnrod Éireann (IÉ) wish to pre-qualify experienced and proven companies to tender for the construction of a new underbridge (UBC43A) at 18 miles 880 yards on the Dublin-Cork railway line.
The project will be carried out by Iarnród Éireann as enabling works for Kildare County Council to facilitate the construction of the combined M7 Osberstown Interchange and R407 Sallins Bypass Scheme.
The proposed R407 Sallins Bypass, a dual carriageway, will cross under the Cork Line at 18 miles 880 yards for which a new under-bridge is to be constructed to accommodate same.
A full railway shut-down for 84-hours over the Easter period 2018 will be in place to facilitate installation of the bridge units and wing-wall units.
The proposed construction duration will be 12 months.
A Pre-Qualification Questionnaire, and drawings to provide some overview information regarding the scope of the works as currently anticipated, are both attached to this notice.
Iarnrod Éireann (IÉ) wish to pre-qualify experienced and proven companies to tender for the construction of a new underbridge (UBC43A) at 18 miles 880 yards on the Dublin-Cork railway line.
The project will be carried out by Iarnród Éireann as enabling works for Kildare County Council to facilitate the construction of the combined M7 Osberstown Interchange and R407 Sallins Bypass Scheme.
The proposed R407 Sallins Bypass, a dual carriageway, will cross under the Cork Line at 18 miles 880 yards for which a new under-bridge is to be constructed to accommodate same.
A full railway shut-down for 84-hours over the Easter period 2018 will be in place to facilitate installation of the bridge units and wing-wall units.
The proposed construction duration will be 12 months.
A Pre-Qualification Questionnaire, and drawings to provide some overview information regarding the scope of the works as currently anticipated, are both attached to this notice.
Object Scope of the procurement
Short description:
Iarnrod Éireann (IÉ) wish to pre-qualify experienced and proven companies to tender for the construction of a new underbridge (UBC43A) at 18 miles 880 yards on the Dublin-Cork railway line.
The project will be carried out by Iarnród Éireann as enabling works for Kildare County Council to facilitate the construction of the combined M7 Osberstown Interchange and R407 Sallins Bypass Scheme.
The proposed R407 Sallins Bypass, a dual carriageway, will cross under the Cork Line at 18 miles 880 yards for which a new under-bridge is to be constructed to accommodate same.
A full railway shut-down for 84-hours over the Easter period 2018 will be in place to facilitate installation of the bridge units and wing-wall units.
The proposed construction duration will be 12 months.
A Pre-Qualification Questionnaire, and drawings to provide some overview information regarding the scope of the works as currently anticipated, are both attached to this notice.
Estimated total value: 5 000 000 EUR 💰
Short description:
The scope of works will include but is not limited to the following:
— Installation of rock socketed contiguous /secant piles and mini-piles to form the temporary works zone to facilitate excavation of the railway embankment and installation of the proposed pre-cast concrete units forming the twin-box structure.
— Supply and/or construction of pre-cast concrete units and installation of dual underpass structure (internal dimension for each underpass segmental unit is 10.8 m wide x 5.88 m high with floor, wall and roof thickness of 800 mm).
— Associated fill to structures;
— Pre-cast wing-wall structures;
— Associated drainage works;
— Numerous services diversions including signalling and esat cables.
Estimated value excluding VAT: 5 000 000 EUR 💰
Duration: 12 months Place of performance
Main site or place of performance: Sallins, Co. Kildare.
Legal, economic, financial and technical information Conditions for participation
Suitability to pursue the professional activity: See Pre-Qualification Questionnaire.
Economic and financial standing: See Pre-Qualification Questionnaire.
Technical and professional ability: See Pre-Qualification Questionnaire.
List and brief description of rules and criteria: See Pre-Qualification Questionnaire.
Contract execution
Legal form to be taken by the group of economic operators to whom the contract is to be awarded:
A Grouping if successful must be prepared to contract as a single entity, or alternatively at Irish Rail's discretion,each member of the group will be required to execute the contract and have joint and several liability.
Procedure
Time of receipt of tenders: 12:00
Languages in which tenders or requests to participate may be submitted: English 🗣️
Tender validity period: 6 months
Complementary information Review body
Name: The High Court
Postal address: Chief Registrar, Four Courts, Inns Quay
Postal town: Dublin
Postal code: 7
Country: Ireland 🇮🇪
Phone: +353 18886000📞
Internet address: http://www.courts.ie🌏
Source: OJS 2017/S 038-069279 (2017-02-21)
Contract award notice (2017-08-23) Object Scope of the procurement
Short description:
Iarnrod Éireann (IÉ) wish to pre-qualify experienced and proven companies to tender for the construction of a new underbridge (UBC43A) at 18 miles 880 yards on the Dublin-Cork railway line.
The project will be carried out by Iarnród Éireann as enabling works for Kildare County Council to facilitate the construction of the combined M7 Osberstown Interchange and R407 Sallins Bypass Scheme.
The proposed R407 Sallins Bypass, a dual carriageway, will cross under the Cork Line at 18 miles 880 yards for which a new underbridge is to be constructed to accommodate same.
A full railway shutdown for 84-hours over the Easter period 2018 will be in place to facilitate installation of the bridge units and wingwall units.
The proposed construction duration will be 12 months.
A Pre-Qualification Questionnaire, and drawings to provide some overview information regarding the scope of the works as currently anticipated, are both attached to this notice.
Iarnrod Éireann (IÉ) wish to pre-qualify experienced and proven companies to tender for the construction of a new underbridge (UBC43A) at 18 miles 880 yards on the Dublin-Cork railway line.
The project will be carried out by Iarnród Éireann as enabling works for Kildare County Council to facilitate the construction of the combined M7 Osberstown Interchange and R407 Sallins Bypass Scheme.
The proposed R407 Sallins Bypass, a dual carriageway, will cross under the Cork Line at 18 miles 880 yards for which a new underbridge is to be constructed to accommodate same.
A full railway shutdown for 84-hours over the Easter period 2018 will be in place to facilitate installation of the bridge units and wingwall units.
The proposed construction duration will be 12 months.
A Pre-Qualification Questionnaire, and drawings to provide some overview information regarding the scope of the works as currently anticipated, are both attached to this notice.
Notice metadata
Document type: Contract award notice
Procedure
Type of bid: Not applicable
Contracting authority Identity
Postal address: Procurement, Engineering & New Works, Inchicore
Object Scope of the procurement
Short description:
The proposed R407 Sallins Bypass, a dual carriageway, will cross under the Cork Line at 18 miles 880 yards for which a new underbridge is to be constructed to accommodate same.
A full railway shutdown for 84-hours over the Easter period 2018 will be in place to facilitate installation of the bridge units and wingwall units.
— installation of rock socketed contiguous /secant piles and minipiles to form the temporary works zone to facilitate excavation of the railway embankment and installation of the proposed precast concrete units forming the twin-box structure.
— supply &/or construction of precast concrete units and installation of dual underpass structure (internal dimension for each underpass segmental unit is 10.8m wide x 5.88m high with floor, wall and roof thickness of 800mm)
— Associated fill to structures.
— Precast wingwall structures.
— Associated drainage works.
Procedure Award criteria
Quality criterion (name): Project Execution Plan
Quality criterion (weighting): 15 %
Quality criterion (name): DRAFT Construction Stage Safety and Health Plan
Quality criterion (weighting): 10 %
Quality criterion (name): Project Programme
Project Specific Environmental Plan
Quality criterion (weighting): 5 %
Cost criterion (name): Comparitive Cost of tender
Cost criterion (weighting): 60 %
Award of contract
Date of contract conclusion: 2017-08-02 📅
Name: John Sisk & Son (Holdings) Ltd
Postal address: Wilton Works, Naas Road
Postal town: Clondalkin
Postal code: Dublin 22
Country: Ireland 🇮🇪 Information about tenders
Number of tenders received: 6
Source: OJS 2017/S 161-332999 (2017-08-23)